What's changing near BR2 0DN
Within 2 km, around Bromley South in Bromley. Building, planning, schools, transport, prices and crime.
148new homes completed within 2 km, last 2 years
36homes given permission on brownfield sites since 2021
-4.1%like-for-like prices in Bromley South, 2024 → 2025 (council +1.6%)
+1%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedflats · Oct 2026
Oct 2026
1.9 km away - New homes
6 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026
1.4 km away - New homes
7 new homes completedflats · Apr 2026
Apr 2026
950 m away - New homes
9 new homes completedflats · Mar 2026
Mar 2026
1.5 km away - New homes
11 new homes completedflats · Jan 2026 – Mar 2026
Mar 2026
1.8 km away - New homes
13 new homes completedflats · Nov 2025
Nov 2025
1.2 km away - New homes
7 new homes completedflats · Nov 2025
Nov 2025
900 m away - New homes
8 new homes completedflats · Jul 2025
Jul 2025
850 m away - School closed
School closed: Bishop Challoner SchoolOther independent school, other independent school (closure)
Jul 2025
500 m away - New homes
5 new homes completedflats · May 2025
May 2025
1.0 km away - New homes
52 new homes completedflats · Jan 2025
Jan 2025
950 m away - New homes
5 new homes completedflats · Nov 2024
Nov 2024
1.9 km away
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
0net new homes in approved schemes since 2023
- Application Under Consideration
Shortlands Golf Club, Meadow Road, BR2 0DXRemoval of Condition No. 3 Landscaping (soft), of planning permission 23/04404/FULL1 dated 26 January 2024 (for Erection of black metal railings to highway boundary with Ravensbourne Avenue (RETROSPECTIVE) to omit landscaping requirement.Bromley 23/04404/RECON · All Other
May 2025
200 m away - No Objection to Proposal (OBS only)
1, Peter House, Beckenham Lane, BR2 0DBT1 Contorted Willow - Laterally reduce to give 2m clearance from the building only. T2 Holly - Fell due to terminal decline. T3 Lawson Cypress - Fell due to terminal decline.Bromley 25/01927/TREE · All Other
May 2025
350 m away - No Objection to Proposal (OBS only)
Pixfield Court, Beckenham Lane, BR2 0DGT1 Eucalyptus - Crown reduce height by 3m from 15m to 12m. Reduce lateral spread by 2m from 9m to 7m on all compass points. T2 Oak - Crown reduce height by 3m from 14m to 11m. Reduce lateral spread by 2m from 8m to 6m on all compass points.Bromley 25/01916/TREE · All Other
May 2025
300 m away - Application Under Consideration
22, Meadow Road, BR2 0DXLoft conversion with rear dormer and two front rooflights (RETROSPECTIVE)Bromley 25/01706/FULL6 · Householder
May 2025
100 m away - Application Under Consideration
20, Ravensbourne Avenue, BR2 0BPDemolition of a garage outbuilding. Construction of single storey rear/side extension with new side gate, loft conversion with addition of rear and side roof dormers and front roof lights, construction of replacement front porched area shared between Nos 20 and 22 and elevational alterations.Bromley 25/01506/FULL6 · Householder
May 2025
200 m away
27homes extended 2021–2025, typically adding 29 m²
45since energy certificates began (2008)
0in BR2 0DN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
33 planned, approved or being built and 2 running (36 MW between them). Those within 5 km are on the map above.
- Rooftop solar
J Sainsbury, Walters Yard - Solar PanelsApproved, not yet built · 240 kW
Jun 2026
750 m away - Rooftop solar
Pavilion Leisure Centre, Kentish Way - Solar PanelsApproved, not yet built · 180 kW
Apr 2023
1.0 km away - Rooftop solar
Downham Health & Leisure Centre, Moorside Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025
2.3 km away - Rooftop solar
Sedgehill Academy, Sedgehill Road - Solar PanelsApproved, not yet built · 390 kW
Nov 2025
2.7 km away - Rooftop solar
The Spa, Beckenham Road - Solar PanelsApproved, not yet built · 290 kW
Apr 2023
2.9 km away - Rooftop solar
David Lloyd Leisure, Stanhope Grove - Solar PanelsApproved, not yet built · 490 kW
Aug 2023
3.0 km away - Rooftop solar
Bethlem Royal Hospital, Monks Orchard Road - Solar Panels & Air Source Heat PumpsApproved, not yet built
Aug 2022
3.7 km away - Rooftop solar
Croydon Road - Solar PanelsApproved, not yet built · 180 kW
Oct 2023
3.8 km away - Rooftop solar
Bethlem Royal Hospital, Monks Orchard Road - Solar PanelsPlanning application in
May 2026
3.9 km away - Rooftop solar
Trinity School Of John Whitgift, Shirley Road - Solar PanelsApproved, not yet built
Apr 20235.3 km away
Road and street works within 1 km
10 permitted works running now or planned, 3 of them major.
- Major, planned
Madeira Avenue, BromleyUtility repair and maintenance works · THAMES WATER · Road closure
Nov 2026 to Nov 2026
350 m away - Major, planned
Cumberland Road, ShortlandsDisconnection or alteration of supply · SOUTHERN GAS NETWORKS PLC · Road closure
Oct 2026 to Oct 2026
950 m away - Major
Cumberland Road, ShortlandsDisconnection or alteration of supply · SOUTHERN GAS NETWORKS PLC · Road closure
Oct 2026 to Oct 2026
950 m away - Standard
Blyth Road, BromleyNew service connection · UK POWER NETWORKS EASTERN & LONDON · Two-way signals
Oct 2026 to Oct 2026
550 m away - Standard
Hillside Road, ShortlandsUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
550 m away - Standard
Station Road, BromleyNew service connection · UK POWER NETWORKS EASTERN & LONDON · Some carriageway incursion
Nov 2026 to Nov 2026
900 m away - Minor
Valan Leas, ShortlandsUtility asset works · THAMES WATER · No carriageway incursion
Nov 2026 to Nov 2026
800 m away - Minor
St Mary'S Avenue, ShortlandsUtility asset works · THAMES WATER · No carriageway incursion
Dec 2026 to Dec 2026
800 m away - Minor
Winchester Road, ShortlandsUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026
850 m away
Major infrastructure projects within 30 km
- Pre-applicationapplication due March 2028
8.7 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
10.6 km away - Decideddecided Sept 2014
14.0 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
15.1 km away - Decideddecided Nov 2025
15.3 km away - Decideddecided Apr 2014
22.2 km away - Decided
Transport schemes within 20 km
- Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
12.3 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
13.0 km away - Transport
Barking Riverside Overground stationNew station and Overground extension, opened July 2022
Jul 2022
14.8 km away - TransportMay 2022
17.4 km away
4, Madeira Avenue, BR1 4AYDemolition of conservatory construction of a single storey side extension.Bromley 25/01640/FULL6 · Householder
No Objection to Proposal (OBS only)1, Nightingale Court, Flat 1, Valley Road, BR2 0DPT1 Self seeded Ash - Remove to ground level and grind out stump. T3 Hawthorn - Prune back lateral branches by 0.5m to give a 2m clearance from property. T4 Holly - Reduce top by 4m, reduce lateral branches by 2m to give clearance from street light and road way. Lift over footpath to give 2.5m clearance. T5 Cherry - Reduce crown by 2m all round back to previous pruning points. Lift over communalBromley 25/00344/TREE · All Other
Jan 2025
150 m away DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.