What's changing near BR1 3PB
Within 2 km, around Bromley North & Sundridge in Bromley. Building, planning, schools, transport, prices and crime.
110new homes completed within 2 km, last 2 years
36homes given permission on brownfield sites since 2021
+2.3%like-for-like prices in Bromley North & Sundridge, 2024 → 2025 (council +1.6%)
+6%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026
1.9 km away - New homes
7 new homes completedflats · Apr 2026
Apr 2026
850 m away - New homes
7 new homes completedflats · Nov 2025
Nov 2025
750 m away - New homes
8 new homes completedflats · Jul 2025
Jul 2025
1.2 km away - School closed
School closed: Bishop Challoner SchoolOther independent school, other independent school (closure)
Jul 2025
1.8 km away - New homes
5 new homes completedflats · May 2025
May 2025
800 m away - New homes
6 new homes completedflats · Feb 2025
Feb 2025
1.9 km away - New homes
52 new homes completedflats · Jan 2025
Jan 2025
750 m away - Planning permissionMay 2024
1.4 km away - School closed
School closed: Ashgrove School LtdOther independent school, other independent school (closure)
Jul 2023
1000 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 21 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
90net new homes in approved schemes since 2023
- Application Under Consideration
61, Freelands Road, BR1 3HZReplace existing 1m high iron fence with black iron fence and automatics sliding gate 2m high (Retrospective)Bromley 25/01692/FULL6 · Householder
Jun 2025
450 m away - Application Under Consideration
Land Rear Of 12 Aldermary Road, Ronalds RoadConstruction of a two bedroom two storey residential dwelling with front balcony and associated car parking and refuse storage.Bromley 25/01511/FULL1 · All Other · 1 homes proposed
Jun 2025
450 m away - Application Under Consideration
33, Croft Road, BR1 4DRL-shaped dormer loft conversion with two front roof lightsBromley 25/01616/FULL6 · Householder
May 2025
300 m away - Application Under Consideration
61, Park Avenue, BR1 4EGSingle storey rear extension and elevational alterations.Bromley 25/01724/FULL6 · Householder
May 2025
450 m away - Application Under Consideration
87, London Lane, BR1 4HFSingle story rear extension, addition of rear dormer and elevational alterations.Bromley 25/01572/FULL6 · Householder
May 2025
400 m away - Application Under Consideration
21, Hawes Road, BR1 3JSDemolition of single storey side extension. Part garage conversion into utility room, construction of a single storey side and rear infill extension with the addition of a bay window, and elevational alterations.Bromley 25/01464/FULL6 · Householder
May 2025
350 m away - Application Under Consideration
36homes extended 2021–2025, typically adding 27 m²
61since energy certificates began (2008)
2in BR1 3PB itself
- Extendedcertificate 2023
- Extendedcertificate 2012
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
34 planned, approved or being built and 3 running (108 MW between them). Those within 5 km are on the map above.
- Rooftop solar
J Sainsbury, Walters Yard - Solar PanelsApproved, not yet built · 240 kW
Jun 2026
900 m away - Rooftop solar
Pavilion Leisure Centre, Kentish Way - Solar PanelsApproved, not yet built · 180 kW
Apr 2023
1.2 km away - Rooftop solar
Downham Health & Leisure Centre, Moorside Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025
1.6 km away - Rooftop solar
Sedgehill Academy, Sedgehill Road - Solar PanelsApproved, not yet built · 390 kW
Nov 2025
3.1 km away - Rooftop solar
The Spa, Beckenham Road - Solar PanelsApproved, not yet built · 290 kW
Apr 2023
4.0 km away - Rooftop solar
David Lloyd Leisure, Stanhope Grove - Solar PanelsApproved, not yet built · 490 kW
Aug 2023
4.3 km away - Rooftop solar
Bethlem Royal Hospital, Monks Orchard Road - Solar Panels & Air Source Heat PumpsApproved, not yet built
Aug 2022
5.0 km away - Rooftop solar
David Lloyd Leisure Limited, Corner Of Weigall Road - Solar PanelsApproved, not yet built · 210 kW
Sept 2023
5.1 km away - Rooftop solar
Croydon Road - Solar PanelsApproved, not yet built · 180 kW
Oct 2023
5.1 km away - Rooftop solar
Bethlem Royal Hospital, Monks Orchard Road - Solar PanelsPlanning application in
May 20265.3 km away
Road and street works within 1 km
7 permitted works running now or planned.
- Standard
Cambridge Road, BromleyUtility repair and maintenance works · THAMES WATER · Lane closure
May 2027 to May 2027
150 m away - Standard
Station Road, BromleyNew service connection · UK POWER NETWORKS EASTERN & LONDON · Some carriageway incursion
Nov 2026 to Nov 2026
600 m away - Standard
New Street Hill, BromleyUtility asset works · BT · No carriageway incursion
Oct 2026 to Oct 2026
900 m away - Standard
Blyth Road, BromleyNew service connection · UK POWER NETWORKS EASTERN & LONDON · Two-way signals
Oct 2026 to Oct 2026
900 m away - Minor
London Lane, BromleyUtility repair and maintenance works · THAMES WATER · Multi-way signals
Oct 2026 to Nov 2026
500 m away - Minor
Warner Road, BromleyUtility asset works · THAMES WATER · Some carriageway incursion
Nov 2026 to Nov 2026
750 m away - Minor
Southover, BromleyUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due March 2028
7.9 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
9.8 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
13.7 km away - Decideddecided Nov 2025
13.9 km away - Decideddecided Sept 2014
14.0 km away - Decideddecided Apr 2014
21.6 km away - Decided
Transport schemes within 20 km
- Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
12.7 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
13.4 km away - Transport
Barking Riverside Overground stationNew station and Overground extension, opened July 2022
Jul 2022
13.5 km away - TransportMay 2022
17.6 km away
Approved37, College Road, BR1 3PUChange of use of lower ground floor from Use Class E (Commercial, Business and Service) to Use Class C3 (Dwellinghouses) to form 1 residential unit, under Class MA, Part 3, Schedule 2 of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (56 day application for prior approval in respect of transport and highways impacts, contamination risks, flood risk, noise impBromley 25/01346/CUETC3 · All Other · 1 homes proposed
Apr 2025
500 m away Running nearest: Thameside DC (rooftop solar, 8.7 km); SELCHP ERF (energy from waste, 9.1 km); Riverside Resource Recovery Facility (RRRF) (energy from waste, 9.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.