Within 2 km, around Bickley East in Bromley. Building, planning, schools, transport, prices and crime.
28new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.3%like-for-like prices in Bickley East, 2024 → 2025 (council +1.6%)
-2%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
8 new homes completedflats · Dec 2025
Dec 2025 1000 m away
New homes
6 new homes completedflats · Jul 2025
Jul 2025 1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
7net new homes in approved schemes since 2023
Application Under Consideration
85, Southborough Road, BR1 2EPSingle storey rear extension including the demolition of existing single storey extensionBromley 25/01909/FULL6 · Householder
May 2025 300 m away
Application Under Consideration
3, Highfield Road, BR1 2JNRear extension at first floor and amendments in internal layoutBromley 25/01763/FULL6 · Householder
1, Oldfield Close, BR1 2LLRetrospective application for alterations to the front brick wall and railingsBromley 25/01304/FULL6 · Householder
May 2025 300 m away
Not Required
27, The Vines, Highfield Road, BR1 2JNSingle storey rear extension, extending beyond the rear wall of the original house by 8m, for which the maximum height would be 3.8m, and for which the height of the eaves would be 2.5m (42 Day Notification for Householder Permitted Development Prior Approval)Bromley 25/01611/HHPA · Prior Approval
May 2025 50 m away
Not Required
264, Southborough Lane, BR2 8ASSingle storey rear extension, extending beyond the rear wall of the original house by 6m, for which the maximum height would be 3m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval)Bromley 25/01500/HHPA · Prior Approval
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
5, Claremont Road, BR1 2JLAlterations to a roof to create a loft conversion using a rear dormer roof extension, two hip to gable side extensions with "Barn Hips", plus three roof lights to the front slope and one roof light to the rear slope.Bromley 25/01291/FULL6 · Householder
Apr 2025 200 m away
Approved
2, Timms Close, BR1 2GZDemolition of existing conservatory. Construction of a single storey replacement extension with patio and elevational alterationsBromley 25/01151/FULL6 · Householder
Apr 2025 450 m away
Approved
38, Homemead Road, BR2 8BADemolition of existing conservatory. Construction of single storey rear infill extension, part garage conversion, detached garden building to rear and elevational alterations.Bromley 25/00889/FULL6 · Householder
Apr 2025 350 m away
Refused
12, Woodside Road, BR1 2ESOutbuilding for garden storage and Summerhouse including patio with raised steps LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01213/PLUD · All Other
Mar 2025 400 m away
Approved
45, Springfield Gardens, BR1 2LYSingle storey side extensionBromley 25/00711/FULL6 · Householder
Mar 2025 150 m away
Closed
9, Highlands, Flat 6, Oldfield Road, BR1 2LEDetails submitted to comply with the requirements of the following conditions relating to planning permission ref: 24/00812/FULL1 Condition 3: Construction and Environmental Management Plan Condition 4: Tree Protection Plan and Arboricultural Method Statement Condition 5: Surface Water Drainage Condition 6: Slab and Site LevelsBromley 24/00812/CONDIT · All Other
Mar 2025 400 m away
Approved
37, Rose Cottage, Springfield Gardens, BR1 2LYUse of room at dwellinghouse for home office LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/00236/PLUD · All Other
Feb 2025 200 m away
Approved
5, Oldfield Close, BR1 2LLPart one/part two storey front, side and rear extensions, conversion of roof space to habitable accommodation including increase in ridge height, rear dormer extensions, front and side rooflights, and elevational alterationsBromley 25/00505/FULL6 · Householder
Feb 2025 250 m away
Pre-application Advice Case Completed
5, Oldfield Close, BR1 2LLTelephone consultation following refusal of application 24/04421/FULL6.Bromley 25/00499/PRETEL · All Other
Feb 2025 250 m away
Approved
86, Southborough Road, BR1 2ENSingle storey rear extension and loft conversion with two rear dormers and barn-hip roof to the flanks with roof light on front elevationBromley 25/00418/FULL6 · Householder
Feb 2025 300 m away
Approved
9, Highfield Road, BR1 2JNConversion of existing garage/shed to habitable accommodation and erection of two storey side and single storey side/rear extension, roof extension comprising of rear dormer with Juliet balcony and hardstanding for 4 car parking spaces and additional vehicular access to front (Amended description)Bromley 25/00138/FULL6 · Householder
Jan 2025 100 m away
Approved
1, Carrington, Timms Close, BR1 2GZT1 Horse chestnut - Reduce height and east side branches by up to 1.5m. Every cut shall be made to suitable growth points at least 1/3 diameter of each parent branch. T2 Horse chestnut - Reduce to growth points at least 1/3 diameter of each parent branch in the vicinity of the previous pruning points, which shall be retained. SUBJECT TO TPO 1784 (8.2.2001)Bromley 24/04828/TPO · All Other
Dec 2024 450 m away
Refused
1, Carrington, Timms Close, BR1 2GZT1 Horse chestnut - Full removal including stump (or if this is not accepted, pollard by 3-4m). T2 Horse chestnut - Full removal including stump (or if this is not accepted pollard by 3-4m). SUBJECT TO TPO 1784 (8.2.2001)Bromley 24/04828/TPSPLD · All Other
Dec 2024 450 m away
Closed
62, Brookmead Avenue, BR1 2LADetails submitted to comply with the requirements of the following conditions relating to planning permission 24/03322/FULL1: Condition 3 - Existing ground levels and proposed slab levels and building heights Condition 4 - Scheme for Surface Water Drainage Condition 5 - Construction and Environmental Management Plan Condition 6 - Landscaping (soft and Hard) Condition 7 - Cycle parking details CondBromley 24/03322/CONDIT · All Other
Dec 2024 200 m away
Approved
5, Springfield Gardens, BR1 2LYDemolition of rear conservatory and chimney, demolition of garage and construction of single storey rear extension and single storey side extension.Bromley 24/04583/FULL6 · Householder
Dec 2024 350 m away
Approved
5, Springfield Gardens, BR1 2LYDemolition of chimney, construction of hipped to gable loft conversion including rear roof dormer and two front roof lights. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 24/04584/PLUD · All Other
88, Southborough Road, BR1 2ENSingle storey side/rear extensionBromley 24/04346/FULL1 · All Other
Dec 2024 300 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
The Spa, Beckenham Road - Solar PanelsApproved, not yet built · 290 kW
Apr 2023 6.2 km away
Rooftop solar
Avery Hill Campus, Avery Hill Road - Solar PanelsApproved, not yet built · 530 kW
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.