What's changing near BR1 2AD
Within 2 km, around Chislehurst West & Elmstead in Bromley. Building, planning, schools, transport, prices and crime.
38new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.4%like-for-like prices in Chislehurst West & Elmstead, 2024 → 2025 (council +1.6%)
-16%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
8 new homes completedflats · Dec 2025
Dec 2025
500 m away - New homes
6 new homes completedflats · Jul 2025
Jul 2025
1.7 km away - New homes
6 new homes completedflats · Feb 2025
Feb 2025
1.2 km away - School closed
School closed: Ashgrove School LtdOther independent school, other independent school (closure)
Jul 2023
1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
3net new homes in approved schemes since 2023
- Application Under Consideration
2, Beech Copse, BR1 2NXErection of roof extension, incorporating side dormer windows, raised ridge height, in connection with loft conversion.Bromley 25/01941/FULL6 · Householder
Jun 2025
250 m away - Application Under Consideration
Dalmore House, Woodlands Road, BR1 2AEMature Monterey Cypress tree inbetween house and pool - Reduce in height and lateral spread by up to 1m. Mature Sweet Chestnut tree to right of main entrance gates - Reduce, trim and crown thin (remove dead branches) by up to 1m. Leylandii on border with Crawfordsburn and Woodlands Road - Trim sides and reduce height by up to 1m.Bromley 25/02125/TREE · All Other
Jun 2025
150 m away - Application Under Consideration
Carpenters Lodge, St Nicolas Lane, BR7 5LLRaising ridge height to form habitable accommodation in loft space with front and rear dormers and elevational alterations (Resubmission of 22/01277/FULL6)Bromley 25/01929/FULL6 · Householder
May 2025
450 m away - Application Under Consideration
4, Wellands Close, BR1 2AQYews x 2 - Trim/prune (maximum 30cm) to previously maintained form. SUBJECT TO TPO 66 (14.7.1971)Bromley 25/01898/TPO · All Other
May 2025
250 m away - No Objection to Proposal (OBS only)
16, Pines Road, BR1 2AAT1 Yew on rear right hand boundary - Reduce overall canopy by up to 1m and shape accordingly. G1 Pine x 5 (Group of 5 trees in front garden) - Reduce the overall height by up to 0.5m and reduce a selection of lateral branches by up to 1.5m on the property side to ensure clearance from roof. Remove major deadwood throughout the canopy. G2 Ash & Sycamore on rear left hand boundary (Group of 5 treesBromley 25/01731/TREE · All Other
May 2025
250 m away
18homes extended 2021–2025, typically adding 58 m²
24since energy certificates began (2008)
2in BR1 2AD itself
- Extendedcertificate 2023
- Extendedcertificate 2021
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
30 planned, approved or being built and 2 running (73 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Pavilion Leisure Centre, Kentish Way - Solar PanelsApproved, not yet built · 180 kW
Apr 2023
2.0 km away - Rooftop solar
J Sainsbury, Walters Yard - Solar PanelsApproved, not yet built · 240 kW
Jun 2026
2.3 km away - Rooftop solar
Downham Health & Leisure Centre, Moorside Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025
3.6 km away - Rooftop solar
Avery Hill Campus, Avery Hill Road - Solar PanelsApproved, not yet built · 530 kW
Mar 2026
5.2 km away - Rooftop solar
Sedgehill Academy, Sedgehill Road - Solar PanelsApproved, not yet built · 390 kW
Nov 2025
5.3 km away - Rooftop solar
Tesco Stores Limited, Edgington Way - Solar PanelsApproved, not yet built · 180 kW
Nov 2025
5.3 km away - Rooftop solar
David Lloyd Leisure, Baugh Road - Solar PanelsApproved, not yet built
Sept 2025
5.3 km away - Rooftop solar
Maidstone Road - Solar PanelsApproved, not yet built · 340 kW
Dec 2023
5.5 km away - Rooftop solar
David Lloyd Leisure, Stanhope Grove - Solar PanelsApproved, not yet built · 490 kW
Aug 2023
5.8 km away - Rooftop solar
The Spa, Beckenham Road - Solar PanelsApproved, not yet built · 290 kW
Apr 2023
5.9 km away
Road and street works within 1 km
12 permitted works running now or planned, 9 of them major.
- Major, planned
St Michael'S Close, BickleyUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Nov 2026 to Nov 2026
550 m away - Major, planned
Beresford Drive, BickleyUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Nov 2026 to Nov 2026
550 m away - Major, planned
Bird In Hand Lane, BickleyUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Nov 2026 to Dec 2026
600 m away - Major, planned
Westwood Close, BromleyUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Dec 2026 to Dec 2026
650 m away - Major, planned
Nightingale Lane, BickleyUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Nov 2026 to Dec 2026
700 m away - Major, planned
Clarence Road, BickleyUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Jan 2027 to Feb 2027
700 m away - Major, planned
The Avenue, BickleyUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Jan 2027 to Feb 2027
900 m away - Major
Sundridge Avenue, BromleyUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2026 to Nov 2026
950 m away - Major
Edgeborough Way, Bromley
Major infrastructure projects within 30 km
- Pre-applicationapplication due March 2028
9.4 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
11.1 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
13.4 km away - Decideddecided Nov 2025
13.6 km away - Decideddecided Sept 2014
16.1 km away - Decideddecided Apr 2014
23.1 km away - Decided
Transport schemes within 20 km
- Transport
Barking Riverside Overground stationNew station and Overground extension, opened July 2022
Jul 2022
13.7 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
14.8 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
15.5 km away - TransportMay 2022
19.7 km away
Application Under ConsiderationBullers Wood School For Boys, Chislehurst Road, BR1 2NWDetails submitted to comply with the requirements of the following conditions relating to planning permission 20/03904/FULL1: Provision of Multi Use Games Area (MUGA), internal pathway, fencing and secondary pedestrian access onto Bickley Road, relating to Condition 3(iiii) - Site Supervisions and Monitoring Report (Arboriculture)Bromley 20/03904/CONDT1 · All Other
Apr 2025
400 m away Bethlem Royal Hospital, Monks Orchard Road - Solar Panels & Air Source Heat PumpsApproved, not yet built
Running nearest: Riverside Resource Recovery Facility (RRRF) (energy from waste, 8.7 km); Thameside DC (rooftop solar, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.