What's changing near BN43 5JH
Within 2 km, around Shoreham Central & Beach in Adur. Building, planning, schools, transport, prices and crime.
473new homes completed within 2 km, last 2 years
245homes given permission on brownfield sites since 2021
-4.2%like-for-like prices in Shoreham Central & Beach, 2024 → 2025 (council +1.0%)
-10%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
92 new homes completedflats · Dec 2025
Dec 2025
850 m away - New homes
72 new homes completedflats · Nov 2025
Nov 2025
250 m away - New homes
84 new homes completedflats · Jul 2025
Jul 2025
900 m away - New homes
79 new homes completedflats · Apr 2025
May 2025
1000 m away - New homes
32 new homes completedflats · Jan 2025 – Mar 2025
Mar 2025
1.5 km away - New homes
17 new homes completedflats · Jan 2025
Jan 2025
1.5 km away - New homes
44 new homes completedflats · Dec 2024
Dec 2024
300 m away - New homes
40 new homes completedflats · Dec 2024
Dec 2024
300 m away - Planning permissionDec 2023
1.1 km away - Planning permissionNov 2023
850 m away - Planning permission
34homes extended 2021–2025, typically adding 37 m²
51since energy certificates began (2008)
3in BN43 5JH itself
- Extendedcertificate 2024
- Extendedcertificate 2015
- Extendedcertificate 2013
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
112hours of spills in 2025 between them (typical neighbourhood: about 36)
47spill events counted
- Southern Water
Shoreham Wwtwinto English Channel · near bathing water: Hove; Shoreham Beach; Southwick39 spills, 110 hours in 2025
1.9 km away - Southern Water
Upper Shoreham Road Shoreham Csointo River Adur · near bathing water: Shoreham Beach; Southwick5 spills, 1 hours in 2025
1.1 km away - Southern Water
The Green Southwick Csointo The Adur Estuary · near bathing water: Shoreham Beach; Southwick1 spills, 1 hours in 2025
1.6 km away - Southern Water
Ropetackle Street, Shoreham P.S.into The River Adur (Tidal) · near bathing water: Lancing, Beach Green; Shoreham Beach; Southwick2 spills, 0 hours in 2025
1.1 km away - Southern Water
Shoreham Wwtwinto English Channel · near bathing water: Shoreham Beach; Southwick0 spills, 0 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
15 planned, approved or being built and 3 running (14 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Dunelm - Solar PanelsApproved, not yet built · 160 kW
Jul 2025
400 m away - Rooftop solar
Reception Shoreham Technical Centre - Solar PV Panel PanelsApproved, not yet built · 210 kW
Jun 2024
2.3 km away - Battery storage
Cemex Brighton Plant & Wharf, Wellington Road - Battery StorageApproved, not yet built
Jan 2025
4.4 km away - Rooftop solar
Cemex Brighton Plant & Wharf, Wellington Road - Solar PanelsApproved, not yet built
Jan 2025
4.4 km away - Rooftop solar
Old Shoreham Road - Solar PanelsApproved, not yet built · 570 kW
May 2025
4.4 km away - Rooftop solar
Chartwell Road - Solar PanelsApproved, not yet built · 350 kW
Sept 2022
4.9 km away - Battery storage
Halewick Lane, Sompting - Battery-based Energy Storage FacilityBeing built · 50 MW
Feb 2023
5.0 km away - Rooftop solar
Hove Polyclinic, Nevill Avenue - Solar PanelsApproved, not yet built · 200 kW
Jan 2025
5.5 km away - Rooftop solar
Dominion Way - Solar photovoltaicsApproved, not yet built · 440 kW
Jul 2022
6.4 km away - Solar farm
Glaxo Smithkline, Southdownview Way - Photovoltaic Solar PanelsApproved, not yet built
Aug 2025
6.8 km away
Road and street works within 1 km
14 permitted works running now or planned, 10 of them major.
- Major
Corbyn Crescent, Shoreham-By-SeaUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Sept 2026 to Nov 2026
500 m away - Major, planned
Western Road, Shoreham-By-SeaHighway improvement works · WEST SUSSEX COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
700 m away - Major
Western Road, Shoreham-By-SeaHighway improvement works · WEST SUSSEX COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
700 m away - Major
The Herons, Shoreham-By-SeaUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Sept 2026 to Nov 2026
850 m away - Major
Footway The Herons 5 To 7, Shoreham-By-SeaUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Sept 2026 to Nov 2026
850 m away - Major
Footway The Herons 13 To 16, Shoreham-By-SeaUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Sept 2026 to Nov 2026
850 m away - Major
Footway The Herons 9 To 11, Shoreham-By-SeaUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Sept 2026 to Nov 2026
900 m away - Major
Ship Street, Shoreham-By-SeaUtility repair and maintenance works · SOUTHERN WATER · Road closure
Aug 2026 to Oct 2026
900 m away - Major
The Cygnets, Shoreham-By-Sea
Major infrastructure projects within 30 km
- Decideddecided Apr 2025
21.1 km away - Decideddecided Jul 2014
22.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: ParkerSteel Shoreham Plant (rooftop solar, 3.5 km); Kings Barn Farm - Energy Barn (battery storage, 7.6 km); Horton Landfill Site (landfill gas, 7.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.