Country England and Wales › Region South East › Council Brighton and Hove › Neighbourhood Mile Oak › Postcode BN41 2WN What's changing near BN41 2WN Within 2 km, around Mile Oak in Brighton and Hove. Building, planning, schools, transport, prices and crime.
12 new homes completed within 2 km, last 2 years
61 homes given permission on brownfield sites since 2021
+4.3% like-for-like prices in Mile Oak, 2024 → 2025 (council +0.5%)
-4% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 7 new homes completed 3 flats, 4 houses · Dec 2024 – Aug 2025
Aug 2025 1.3 km away Planning permission Permission for 28 homes Portslade Village Centre 3 Courthope Close Portslade BN41 2LZ (full planning permission)
Oct 2024 1.6 km away Planning permission Permission for 15 homes Windlesham House 123 Windlesham Close Portslade BN41 2AB (full planning permission)
Oct 2024 1.8 km away Planning permission Permission for 13 homes 26 Abinger Road Portslade BN41 1SB (outline planning permission)
May 2024 1.9 km away Planning permission Permission for 5 homes Garage Compound Rear Of Kingston Broadway Hawkins Road Shoreham-by-sea (full planning permission) Nov 2021 1.9 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
17 homes extended 2021–2025, typically adding 34 m²
31 since energy certificates began (2008)
2 in BN41 2WN itself
Extended certificate 2021 Extended certificate 2016 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 13 planned, approved or being built and 3 running (14 MW between them). Those within 5 km are on the map above.
Rooftop solar Old Shoreham Road - Solar Panels Approved, not yet built · 570 kW
May 2025 2.1 km away Rooftop solar Hove Polyclinic, Nevill Avenue - Solar Panels Approved, not yet built · 200 kW
Jan 2025 3.0 km away Battery storage Cemex Brighton Plant & Wharf, Wellington Road - Battery Storage Approved, not yet built
Jan 2025 3.3 km away Rooftop solar Cemex Brighton Plant & Wharf, Wellington Road - Solar Panels Approved, not yet built
Jan 2025 3.3 km away Rooftop solar Dunelm - Solar Panels Approved, not yet built · 160 kW
Jul 2025 3.5 km away Rooftop solar Reception Shoreham Technical Centre - Solar PV Panel Panels Approved, not yet built · 210 kW
Jun 2024 4.7 km away Solar farm Horton Landfill Site, Henfield Road - Solar Panels Planning application in · 13 MW
Apr 2024 6.4 km away Battery storage Halewick Lane, Sompting - Battery-based Energy Storage Facility Being built · 50 MW
Feb 2023 7.3 km away Rooftop solar Chartwell Road - Solar Panels Approved, not yet built · 350 kW
Sept 2022 8.2 km away Solar farm Horsham Road - Solar Farm & Battery Storage Planning application in · 50 MW
Jan 2022 9.0 km away Road and street works within 1 km 1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Apr 2025 24.2 km away Decided decided Jul 2014 24.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: ParkerSteel Shoreham Plant (rooftop solar, 3.0 km); Horton Landfill Site (landfill gas, 6.5 km); Kings Barn Farm - Energy Barn (battery storage, 7.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.