Country England and Wales › Region South East › Council Brighton and Hove › Neighbourhood Portslade by Sea › Postcode BN41 1DB What's changing near BN41 1DB Within 2 km, around Portslade by Sea in Brighton and Hove. Building, planning, schools, transport, prices and crime.
61 new homes completed within 2 km, last 2 years
194 homes given permission on brownfield sites since 2021
-0.3% like-for-like prices in Portslade by Sea, 2024 → 2025 (council +0.5%)
+24% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened School closed Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 5 new homes completed houses · Jul 2026
Jul 2026 700 m away New homes 7 new homes completed 3 flats, 4 houses · Dec 2024 – Aug 2025
Aug 2025 1.5 km away New homes 23 new homes completed houses · Apr 2025
Apr 2025 1.4 km away Planning permission Permission for 34 homes Martello House, 315 Portland Road, Hove (full planning permission)
Mar 2025 800 m away Planning permission Permission for 28 homes Portslade Village Centre 3 Courthope Close Portslade BN41 2LZ (full planning permission)
Oct 2024 1.2 km away Planning permission Permission for 15 homes Windlesham House 123 Windlesham Close Portslade BN41 2AB (full planning permission)
Oct 2024 1.0 km away School closed School closed: St Peter's Community Primary School Community school, primary (closure)
Aug 2024 350 m away New school Jul 2024 850 m away Planning permission Permission for 6 homes 22 - 24 Sackville Gardens Hove BN3 4GH (full planning permission)
May 2024 1.8 km away Planning permission Permission for 13 homes 26 Abinger Road Portslade BN41 1SB (outline planning permission)
May 2024 900 m away 40 homes extended 2021–2025, typically adding 28 m²
77 since energy certificates began (2008)
2 in BN41 1DB itself
Extended certificate 2016 Extended certificate 2011 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 9 planned, approved or being built and 3 running (14 MW between them). Those within 5 km are on the map above.
Battery storage Cemex Brighton Plant & Wharf, Wellington Road - Battery Storage Approved, not yet built
Jan 2025 650 m away Rooftop solar Cemex Brighton Plant & Wharf, Wellington Road - Solar Panels Approved, not yet built
Jan 2025 650 m away Rooftop solar Old Shoreham Road - Solar Panels Approved, not yet built · 570 kW
May 2025 1.2 km away Rooftop solar Hove Polyclinic, Nevill Avenue - Solar Panels Approved, not yet built · 200 kW
Jan 2025 1.8 km away Rooftop solar Dunelm - Solar Panels Approved, not yet built · 160 kW
Jul 2025 3.9 km away Rooftop solar Reception Shoreham Technical Centre - Solar PV Panel Panels Approved, not yet built · 210 kW
Jun 2024 5.9 km away Battery storage Halewick Lane, Sompting - Battery-based Energy Storage Facility Being built · 50 MW
Feb 2023 8.7 km away Rooftop solar Chartwell Road - Solar Panels Approved, not yet built · 350 kW
Sept 2022 8.7 km away Solar farm Horton Landfill Site, Henfield Road - Solar Panels Planning application in · 13 MW
Apr 2024 9.1 km away Running nearest: ParkerSteel Shoreham Plant (rooftop solar, 550 m); Horton Landfill Site (landfill gas, 9.2 km); Kings Barn Farm - Energy Barn (battery storage, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km 5 permitted works running now or planned, 3 of them major.
Major, planned Kingsway, Hove Highway improvement works · BRIGHTON & HOVE CITY COUNCIL · Lane closure
Sept 2026 to May 2028 800 m away Major Kingsway, Hove Highway improvement works · BRIGHTON & HOVE CITY COUNCIL · Lane closure
Oct 2026 to May 2028 800 m away Major Farm Way, Southwick Statutory Infrastructure Works · UK POWER NETWORKS SOUTH EASTERN · Road closure
Nov 2026 to Dec 2026 950 m away Standard Franklin Road, Portslade Utility repair and maintenance works · SOUTHERN WATER · Some carriageway incursion
Oct 2026 to Oct 2026 200 m away Minor Church Road, Portslade Utility repair and maintenance works · SOUTHERN WATER · Multi-way signals
Oct 2026 to Oct 2026 250 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jul 2014 21.8 km away Decided decided Apr 2025 25.0 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.