Country England and Wales › Region South East › Council Brighton and Hove › Neighbourhood Hangleton North › Postcode BN3 7LT What's changing near BN3 7LT Within 2 km, around Hangleton North in Brighton and Hove. Building, planning, schools, transport, prices and crime.
129 new homes completed within 2 km, last 2 years
563 homes given permission on brownfield sites since 2021
+2.5% like-for-like prices in Hangleton North, 2024 → 2025 (council +0.5%)
-13% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened School closed Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 5 new homes completed houses · Jul 2026
Jul 2026 1.8 km away Planning permission Permission for 306 homes Sackville Trading Estate/Coal Yard Sackville Road (Northern site) (full planning permission)
Nov 2025 1.5 km away New homes 50 new homes completed flats · May 2025
May 2025 1.6 km away New homes 17 new homes completed flats · May 2025
May 2025 1.6 km away Planning permission Permission for 34 homes Martello House, 315 Portland Road, Hove (full planning permission)
Mar 2025 1.1 km away New homes 31 new homes completed flats · Mar 2025
Mar 2025 1.5 km away Planning permission Permission for 28 homes Portslade Village Centre 3 Courthope Close Portslade BN41 2LZ (full planning permission)
Oct 2024 1.6 km away Planning permission Permission for 15 homes Windlesham House 123 Windlesham Close Portslade BN41 2AB (full planning permission)
Oct 2024 1.7 km away Planning permission Permission for 6 homes 69 The Droveway Hove BN3 6PR (full planning permission)
Sept 2024 1.8 km away School closed School closed: St Peter's Community Primary School Community school, primary (closure)
Aug 2024 2.0 km away Planning permission 45 homes extended 2021–2025, typically adding 34 m²
71 since energy certificates began (2008)
0 in BN3 7LT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 9 planned, approved or being built and 3 running (14 MW between them). Those within 5 km are on the map above.
Rooftop solar Hove Polyclinic, Nevill Avenue - Solar Panels Approved, not yet built · 200 kW
Jan 2025 500 m away Rooftop solar Old Shoreham Road - Solar Panels Approved, not yet built · 570 kW
May 2025 700 m away Battery storage Cemex Brighton Plant & Wharf, Wellington Road - Battery Storage Approved, not yet built
Jan 2025 1.8 km away Rooftop solar Cemex Brighton Plant & Wharf, Wellington Road - Solar Panels Approved, not yet built
Jan 2025 1.8 km away Rooftop solar Dunelm - Solar Panels Approved, not yet built · 160 kW
Jul 2025 5.0 km away Rooftop solar Reception Shoreham Technical Centre - Solar PV Panel Panels Approved, not yet built · 210 kW
Jun 2024 6.8 km away Solar farm Horton Landfill Site, Henfield Road - Solar Panels Planning application in · 13 MW
Apr 2024 8.7 km away Battery storage Halewick Lane, Sompting - Battery-based Energy Storage Facility Being built · 50 MW
Feb 2023 9.5 km away Rooftop solar Chartwell Road - Solar Panels Approved, not yet built · 350 kW
Sept 2022 10.0 km away Running nearest: ParkerSteel Shoreham Plant (rooftop solar, 2.3 km); Horton Landfill Site (landfill gas, 8.8 km); Kings Barn Farm - Energy Barn (battery storage, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km 12 permitted works running now or planned, 3 of them major.
Major Nevill Avenue, Hove Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Feb 2027 to Mar 2027 200 m away Major, planned Elm Drive, Hove New service connection · UK POWER NETWORKS SOUTH EASTERN · Road closure
Dec 2026 to Dec 2026 350 m away Major, planned Downsview, Hove Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Nov 2026 to Nov 2026 900 m away Standard West Way, Hove Utility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026 100 m away Standard Poplar Avenue, Hove Remedial works · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Oct 2026 to Oct 2026 250 m away Standard Dale View, Hove Utility repair and maintenance works · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026 350 m away Standard Dyke Road South Roundabout, Hove Highway repair and maintenance works · NATIONAL HIGHWAYS · No carriageway incursion
Oct 2026 to Nov 2026 400 m away Standard Fallowfield Close, Hove Utility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026 550 m away Standard Sherbourne Road, Hove Utility repair and maintenance works · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026 650 m away Major infrastructure projects within 30 km Decided decided Jul 2014 22.9 km away Decided decided Apr 2025 26.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.