Country England and Wales › Region South East › Council Brighton and Hove › Neighbourhood West Blatchington › Postcode BN3 6UF What's changing near BN3 6UF Within 2 km, around West Blatchington in Brighton and Hove. Building, planning, schools, transport, prices and crime.
297 new homes completed within 2 km, last 2 years
636 homes given permission on brownfield sites since 2021
+6.2% like-for-like prices in West Blatchington, 2024 → 2025 (council +0.5%)
-11% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened School closed Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 5 new homes completed 4 flats, 1 houses · Nov 2025 – Sep 2026
Sept 2026 1000 m away New homes 9 new homes completed houses · Jun 2026
Jun 2026 450 m away School closed School closed: Drive Preparatory School Other independent school, other independent school (de-registered)
Jun 2026 1.1 km away Planning permission Permission for 306 homes Sackville Trading Estate/Coal Yard Sackville Road (Northern site) (full planning permission)
Nov 2025 1.1 km away School closed School closed: South England International School Other independent school, other independent school (does not meet criteria for registration)
Nov 2025 1.4 km away New homes 42 new homes completed flats · Mar 2025 – May 2025
May 2025 1.7 km away New homes 50 new homes completed flats · May 2025
May 2025 1.2 km away New homes 17 new homes completed flats · May 2025
May 2025 1.2 km away New homes 11 new homes completed 10 flats, 1 houses · Mar 2025 – May 2025
May 2025 400 m away New homes 35 new homes completed flats · Mar 2025
Mar 2025 1.6 km away New homes 31 new homes completed flats · Mar 2025
Mar 2025 1.1 km away 28 homes extended 2021–2025, typically adding 87 m²
61 since energy certificates began (2008)
2 in BN3 6UF itself
Extended certificate 2022 Extended certificate 2020 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 6 planned, approved or being built and 1 running (2 MW between them). Those within 5 km are on the map above.
Rooftop solar Hove Polyclinic, Nevill Avenue - Solar Panels Approved, not yet built · 200 kW
Jan 2025 1.7 km away Rooftop solar Old Shoreham Road - Solar Panels Approved, not yet built · 570 kW
May 2025 2.7 km away Battery storage Cemex Brighton Plant & Wharf, Wellington Road - Battery Storage Approved, not yet built
Jan 2025 3.2 km away Rooftop solar Cemex Brighton Plant & Wharf, Wellington Road - Solar Panels Approved, not yet built
Jan 2025 3.2 km away Rooftop solar Dunelm - Solar Panels Approved, not yet built · 160 kW
Jul 2025 7.1 km away Rooftop solar Reception Shoreham Technical Centre - Solar PV Panel Panels Approved, not yet built · 210 kW
Jun 2024 8.9 km away Running nearest: ParkerSteel Shoreham Plant (rooftop solar, 4.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km 9 permitted works running now or planned, 4 of them major.
Major, planned Tongdean Avenue, Hove Section 50 · BRIGHTON & HOVE CITY COUNCIL · Road closure
Sept 2026 to Oct 2026 400 m away Major Tongdean Avenue, Hove Section 50 · BRIGHTON & HOVE CITY COUNCIL · Road closure
Sept 2026 to Oct 2026 400 m away Major, planned Withdean Road, Brighton Utility asset works · BT · Road closure
Dec 2026 to Dec 2026 700 m away Major Withdean Road, Brighton Utility asset works · BT · Road closure
Dec 2026 to Dec 2026 700 m away Standard Ash Close, Hove Utility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 300 m away Standard Hazeldene Meads, Brighton Utility repair and maintenance works · BT · Give and take
Oct 2026 to Oct 2026 450 m away Standard Chartfield, Hove Utility repair and maintenance works · BT · Give and take
Oct 2026 to Oct 2026 800 m away Standard Queen Victoria Avenue, Hove Utility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026 850 m away Minor Nevill Road, Hove Utility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 800 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jul 2014 22.7 km away Decided decided Apr 2025 28.3 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.