Country England and Wales › Region South East › Council Brighton and Hove › Neighbourhood Patcham West & Westdene › Postcode BN1 8QX What's changing near BN1 8QX Within 2 km, around Patcham West & Westdene in Brighton and Hove. Building, planning, schools, transport, prices and crime.
54 new homes completed within 2 km, last 2 years
89 homes given permission on brownfield sites since 2021
-4.4% like-for-like prices in Patcham West & Westdene, 2024 → 2025 (council +0.5%)
+10% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School closed Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 9 new homes completed houses · Jun 2026
Jun 2026 1.5 km away New homes 11 new homes completed 10 flats, 1 houses · Mar 2025 – May 2025
May 2025 1.5 km away School closed School closed: Brighton & Hove Montessori School Other independent school, other independent school (closure)
Jan 2025 2.0 km away Planning permission Permission for 6 homes 69 The Droveway Hove BN3 6PR (full planning permission)
Sept 2024 1.6 km away Planning permission Sept 2024 900 m away Planning permission Sept 2024 900 m away Planning permission Aug 2024 850 m away Planning permission Aug 2024 850 m away 30 homes extended 2021–2025, typically adding 44 m²
48 since energy certificates began (2008)
1 in BN1 8QX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 7 planned, approved or being built and 1 running (2 MW between them). Those within 5 km are on the map above.
Rooftop solar Hove Polyclinic, Nevill Avenue - Solar Panels Approved, not yet built · 200 kW
Jan 2025 2.8 km away Rooftop solar Old Shoreham Road - Solar Panels Approved, not yet built · 570 kW
May 2025 3.7 km away Battery storage Cemex Brighton Plant & Wharf, Wellington Road - Battery Storage Approved, not yet built
Jan 2025 4.4 km away Rooftop solar Cemex Brighton Plant & Wharf, Wellington Road - Solar Panels Approved, not yet built
Jan 2025 4.4 km away Rooftop solar Dunelm - Solar Panels Approved, not yet built · 160 kW
Jul 2025 8.1 km away Rooftop solar Reception Shoreham Technical Centre - Solar PV Panel Panels Approved, not yet built · 210 kW
Jun 2024 9.7 km away Rooftop solar Garden Pride Garden Centre, Common Lane - Solar Panels Approved, not yet built · 280 kW
Nov 2025 10.0 km away Running nearest: ParkerSteel Shoreham Plant (rooftop solar, 5.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km 10 permitted works running now or planned, 6 of them major.
Major London Road, Brighton Utility repair and maintenance works · SOUTHERN WATER · Contra-flow
Nov 2026 to Nov 2026 100 m away Major, planned Withdean Road, Brighton Utility asset works · BT · Road closure
Dec 2026 to Dec 2026 550 m away Major Withdean Road, Brighton Utility asset works · BT · Road closure
Dec 2026 to Dec 2026 550 m away Major, planned London Road, Brighton Section 58 · BRIGHTON & HOVE CITY COUNCIL · No carriageway incursion
Aug 2026 to Aug 2030 650 m away Major Old Farm Road, Brighton Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Sept 2026 to Oct 2026 800 m away Major Tongdean Avenue, Hove Section 50 · BRIGHTON & HOVE CITY COUNCIL · Road closure
Sept 2026 to Oct 2026 1000 m away Standard Graham Avenue, Brighton Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away Standard Hazeldene Meads, Brighton Utility repair and maintenance works · BT · Give and take
Oct 2026 to Oct 2026 800 m away Standard Ash Close, Hove Utility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 900 m away Standard Westdene Drive, Brighton
Major infrastructure projects within 30 km Decided decided Jul 2014 23.6 km away Decided decided Apr 2025 29.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.