Country England and Wales › Region South East › Council Adur › Neighbourhood North Lancing › Postcode BN15 0RW What's changing near BN15 0RW Within 2 km, around North Lancing in Adur. Building, planning, schools, transport, prices and crime.
148 new homes completed within 2 km, last 2 years
22 homes given permission on brownfield sites since 2021
+5.5% like-for-like prices in North Lancing, 2024 → 2025 (council +1.0%)
+14% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 20 new homes completed houses · Apr 2026 – Oct 2026
Oct 2026 1.2 km away New homes 16 new homes completed houses · Sep 2025 – Jun 2026
Jun 2026 1.3 km away New homes 9 new homes completed flats · May 2026
May 2026 1.1 km away New homes 9 new homes completed flats · May 2026
May 2026 1.1 km away New homes 9 new homes completed flats · Feb 2026
Feb 2026 1.1 km away New homes 6 new homes completed flats · Feb 2026
Feb 2026 1.1 km away New homes 5 new homes completed flats · Feb 2026
Feb 2026 1.1 km away New homes 9 new homes completed flats · Oct 2025
Oct 2025 1.0 km away New homes 8 new homes completed flats · Aug 2025
Aug 2025 1.1 km away New homes 11 new homes completed houses · Oct 2024 – Mar 2025
Mar 2025 1.1 km away New homes 10 new homes completed houses · Nov 2024 – Jan 2025
Jan 2025 1.3 km away New homes 9 new homes completed flats · Nov 2024
Dec 2024 1.0 km away New homes 8 new homes completed flats · Nov 2024
Dec 2024 1.0 km away New homes 9 new homes completed flats · Nov 2024
Nov 2024 1.0 km away Planning permission Feb 2023 2.0 km away Planning permission Dec 2022 1.7 km away Planning permission Dec 2022 1.6 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 18 postcodes nearby had new homes completed in the last two years.
0 homes extended 2021–2025
0 since energy certificates began (2008)
0 in BN15 0RW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 16 planned, approved or being built and 3 running (14 MW between them). Those within 5 km are on the map above.
Rooftop solar Reception Shoreham Technical Centre - Solar PV Panel Panels Approved, not yet built · 210 kW
Jun 2024 1000 m away Battery storage Halewick Lane, Sompting - Battery-based Energy Storage Facility Being built · 50 MW
Feb 2023 1.9 km away Rooftop solar Dunelm - Solar Panels Approved, not yet built · 160 kW
Jul 2025 3.1 km away Rooftop solar Chartwell Road - Solar Panels Approved, not yet built · 350 kW
Sept 2022 3.2 km away Rooftop solar Dominion Way - Solar photovoltaics Approved, not yet built · 440 kW
Jul 2022 4.2 km away Solar farm Glaxo Smithkline, Southdownview Way - Photovoltaic Solar Panels Approved, not yet built
Aug 2025 4.3 km away Rooftop solar Worthing College, Sanditon Way - Solar Panels Approved, not yet built · 190 kW
Mar 2025 5.5 km away Other Worthing Heat Network - Energy Centre Approved, not yet built
Mar 2024 5.8 km away Solar farm Horton Landfill Site, Henfield Road - Solar Panels Planning application in · 13 MW
Apr 2024 6.0 km away Rooftop solar Old Shoreham Road - Solar Panels Approved, not yet built · 570 kW
May 2025 7.0 km away Solar farm Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Apr 2025 18.8 km away Decided decided Jul 2014 25.7 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Kings Barn Farm - Energy Barn (battery storage, 5.0 km); Horton Landfill Site (landfill gas, 6.0 km); ParkerSteel Shoreham Plant (rooftop solar, 6.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.