Country England and Wales › Region South East › Council Brighton and Hove › Neighbourhood Preston Park › Postcode BN1 4QL What's changing near BN1 4QL Within 2 km, around Preston Park in Brighton and Hove. Building, planning, schools, transport, prices and crime.
453 new homes completed within 2 km, last 2 years
295 homes given permission on brownfield sites since 2021
+1.5% like-for-like prices in Preston Park, 2024 → 2025 (council +0.5%)
+10% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 5 new homes completed 4 flats, 1 houses · Nov 2025 – Sep 2026
Sept 2026 2.0 km away New homes 9 new homes completed houses · Jun 2026
Jun 2026 1.8 km away School closed School closed: Drive Preparatory School Other independent school, other independent school (de-registered)
Jun 2026 1.9 km away New homes 10 new homes completed flats · Apr 2026 – May 2026
May 2026 1.7 km away New homes 7 new homes completed flats · Mar 2026
Mar 2026 1.5 km away New homes 16 new homes completed 15 flats, 1 houses · Oct 2025 – Jan 2026
Jan 2026 1.6 km away New homes 6 new homes completed flats · Dec 2025
Dec 2025 1.4 km away New homes 57 new homes completed flats · Dec 2025
Dec 2025 1.5 km away New homes 5 new homes completed flats · Dec 2025
Dec 2025 900 m away School closed School closed: South England International School Other independent school, other independent school (does not meet criteria for registration)
Nov 2025 1.6 km away School closed School closed: St Joseph's Catholic Primary School Voluntary aided school, primary (closure)
Aug 2025 1.2 km away New homes 60 homes extended 2021–2025, typically adding 27 m²
145 since energy certificates began (2008)
6 in BN1 4QL itself
Extended certificate 2023 Extended certificate 2021 Extended certificate 2021 Extended certificate 2019 Extended certificate 2019 Extended Storm overflows within 2 km 1 storm overflows within 2 km
0 hours of spills in 2025 between them (typical neighbourhood: about 36)
0 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 5 planned, approved or being built and 1 running (2 MW between them). Those within 5 km are on the map above.
Rooftop solar Hove Polyclinic, Nevill Avenue - Solar Panels Approved, not yet built · 200 kW
Jan 2025 3.5 km away Battery storage Cemex Brighton Plant & Wharf, Wellington Road - Battery Storage Approved, not yet built
Jan 2025 4.4 km away Rooftop solar Cemex Brighton Plant & Wharf, Wellington Road - Solar Panels Approved, not yet built
Jan 2025 4.4 km away Rooftop solar Old Shoreham Road - Solar Panels Approved, not yet built · 570 kW
May 2025 4.6 km away Rooftop solar Dunelm - Solar Panels Approved, not yet built · 160 kW
Jul 2025 8.8 km away Running nearest: ParkerSteel Shoreham Plant (rooftop solar, 5.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km 10 permitted works running now or planned, 8 of them major.
Major New England Road, Brighton Works for Rail Purposes · NETWORK RAIL · Road closure
Nov 2026 to Nov 2026 300 m away Major, planned Fleet Street, Brighton Works for road purposes · BRIGHTON & HOVE CITY COUNCIL · Lane closure
Sept 2026 to Sept 2027 500 m away Major Fleet Street, Brighton Works for road purposes · BRIGHTON & HOVE CITY COUNCIL · Lane closure
Sept 2026 to Sept 2027 500 m away Major Preston Road, Brighton New service connection · VODAFONE GROUP · Two-way signals
Jan 2027 to Jan 2027 550 m away Major Stanford Avenue, Brighton Utility repair and maintenance works · SOUTHERN WATER · Road closure
Oct 2026 to Oct 2026 900 m away Major Trafalgar Lane, Brighton Highway improvement works · BRIGHTON & HOVE CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 950 m away Major Gloucester Road, Brighton Highway improvement works · BRIGHTON & HOVE CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 950 m away Major Foundry Street, Brighton Highway improvement works · BRIGHTON & HOVE CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 1000 m away Minor London Road, Brighton Utility repair and maintenance works · BRIGHTON & HOVE CITY COUNCIL · No carriageway incursion
Nov 2026 to Nov 2026 550 m away Minor Major infrastructure projects within 30 km Decided decided Jul 2014 21.5 km away Decided decided Apr 2025 29.9 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.