Country England and Wales › Region North West › Council Bolton › Neighbourhood Tonge › Postcode BL2 2LG What's changing near BL2 2LG Within 2 km, around Tonge in Bolton. Building, planning, schools, transport, prices and crime.
252 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+9.5% like-for-like prices in Tonge, 2024 → 2025 (council +3.9%)
– crime data not published here (Greater Manchester)
On the map
New homes School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 9 new homes completed flats · Jul 2025 – Apr 2026
Apr 2026 1.7 km away New homes 6 new homes completed flats · Feb 2026
Feb 2026 1.7 km away New homes 36 new homes completed flats · Jun 2025 – Nov 2025
Nov 2025 1.8 km away New school Sept 2025 450 m away New homes 12 new homes completed flats · Aug 2025
Aug 2025 2.0 km away New homes 34 new homes completed flats · Jul 2025
Jul 2025 1.7 km away New homes 14 new homes completed flats · Jun 2025
Jun 2025 1.7 km away New homes 83 new homes completed flats · Apr 2025
May 2025 1.8 km away New homes 36 new homes completed flats · Nov 2024 – Dec 2024
Dec 2024 1.9 km away New homes 14 new homes completed flats · Nov 2024
Nov 2024 1.9 km away New school New school: Breightmet School Other independent special school, other independent special school
Sept 2024 1.9 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 16 postcodes nearby had new homes completed in the last two years.
13 homes extended 2021–2025, typically adding 18 m²
28 since energy certificates began (2008)
1 in BL2 2LG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 29 storm overflows within 2 km
1,096 hours of spills in 2025 between them (typical neighbourhood: about 36)
535 spill events counted
United Utilities Tonge Bridge Way Cso 0780nn (Bol0244) into River Tonge 83 spills, 191 hours in 2025
1.0 km away United Utilities Astley Bridge Cso 071wp into Astley Brook 47 spills, 183 hours in 2025
1.5 km away United Utilities Waters Meeting Road Cso 073kz into River Tonge 55 spills, 166 hours in 2025
1.0 km away United Utilities Bridge Street Bow Street Cso into Cvrt Sec Middle Brook Trib R R 63 spills, 119 hours in 2025
1.5 km away United Utilities Crown Street Cso 071qi into Croal Minor 78 spills, 98 hours in 2025
1.5 km away United Utilities Royal Oak Cso 07039 into Bradshaw Brook 25 spills, 91 hours in 2025
1.5 km away United Utilities Thicketford Cso 072ux into Bradshaw Brook 30 spills, 82 hours in 2025
750 m away United Utilities Turner Bridge Cso into River Tonge 42 spills, 37 hours in 2025
650 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 23 planned, approved or being built and 8 running (75 MW between them). Those within 5 km are on the map above.
Battery storage Union Court Storage Facility Approved, not yet built · 5 MW
Oct 2021 550 m away Rooftop solar Crompton Health Centre, Crompton Way - Solar Panels Approved, not yet built · 200 kW
Feb 2024 800 m away Rooftop solar Vernacare, Folds Road - Solar PV array Approved, not yet built · 710 kW
Jan 2025 900 m away Rooftop solar Edbro, Lever Street - Solar Panels Approved, not yet built · 2 MW
Jun 2023 2.7 km away Rooftop solar Albion Mill, Cawdor Street - Solar Panels Approved, not yet built · 490 kW
Jun 2025 4.1 km away Rooftop solar Churchill Unit Oncology Royal Bolton Hospital - Solar Panels Approved, not yet built · 170 kW
Feb 2026 4.2 km away Solar farm Seddon Construction, Plodder Lane - Solar Panels Approved, not yet built · 220 kW
May 2025 5.3 km away Battery storage Stoneclough - Battery Energy Storage Approved, not yet built · 7 MW
Oct 2022 6.0 km away Battery storage Shore Top Farm, Kearsley Road - Battery Energy Storage Approved, not yet built · 11 MW
Nov 2025 6.1 km away Rooftop solar Northern Building Plastics, Leadbeaters Lane - Solar Panels Planning application in · 180 kW
Aug 2024 6.2 km away Road and street works within 1 km 28 permitted works running now or planned, 5 of them major.
Major, planned Glaisdale Street, Bolton New service connection · SP Electricity North West · Road closure
Oct 2026 to Oct 2026 400 m away Major Glaisdale Street, Bolton New service connection · SP Electricity North West · Road closure
Oct 2026 to Oct 2026 400 m away Major Entwistle Street, Bolton Utility repair and maintenance works · United Utilities Water Ltd · Road closure
Nov 2026 to Nov 2026 550 m away Major, planned Kentfield Drive, Bolton Utility repair and maintenance works · United Utilities Water Ltd · Road closure
Nov 2026 to Nov 2026 700 m away Major Kentfield Drive, Bolton Utility repair and maintenance works · United Utilities Water Ltd · Road closure
Nov 2026 to Nov 2026 700 m away Standard Thicketford Road, Bolton Utility repair and maintenance works · SP Electricity North West · Multi-way signals
Oct 2026 to Nov 2026 200 m away Standard Tonge Moor Road, Bolton Disconnection or alteration of supply · SP Electricity North West · Multi-way signals
Oct 2026 to Oct 2026 400 m away Standard Tonge Moor Road, Bolton Disconnection or alteration of supply · SP Electricity North West · Two-way signals
Oct 2026 to Oct 2026 400 m away Standard Castle Hill Street, Bolton New service connection · SP Electricity North West · Some carriageway incursion
Oct 2026 to Oct 2026 400 m away Major infrastructure projects within 30 km Decided decided Sept 2025 11.0 km away Pre-application Intermodal Logistics Park North Rail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north). application due May 2027 19.4 km away Decided decided May 2015 26.5 km away Decided decided Aug 2014 27.7 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Salford Road (rooftop solar, 1.6 km); Bolton TRF (energy from waste, 2.6 km); Salford Road Solar Farm (solar farm, 6.0 km); Bent Spur Solar Farm (solar farm, 6.8 km); Lascar Works (battery storage, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.