What's changing near BH23 2SE
Within 2 km, around Jumpers Common & Fairmile in Bournemouth, Christchurch and Poole. Building, planning, schools, transport, prices and crime.
16new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-2.2%like-for-like prices in Jumpers Common & Fairmile, 2024 → 2025 (council -0.1%)
+16%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
22homes extended 2021–2025, typically adding 41 m²
39since energy certificates began (2008)
3in BH23 2SE itself
- Extendedcertificate 2026
- Extendedcertificate 2025
- Extendedcertificate 2023
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
106hours of spills in 2025 between them (typical neighbourhood: about 36)
59spill events counted
- Wessex Water
Not Applicableinto River Stour · near bathing water: Christchurch Avon Beach; Christchurch Friar`s Cliff15 spills, 45 hours in 2025
1.9 km away - Wessex Water
Cooper Dean Combined Sewer Overflowinto River Stour Via Sws12 spills, 30 hours in 2025
1.7 km away - Wessex Water
Holdenhurst Water Recycling Centreinto River Stour · near bathing water: Christchurch Avon Beach; Christchurch Friar`s Cliff4 spills, 20 hours in 2025
1.2 km away - Wessex Water
Not Applicableinto River Stour · near bathing water: Christchurch Avon Beach; Christchurch Friar`s Cliff23 spills, 10 hours in 2025
1.6 km away - Wessex Water
Not Applicableinto River Stour · near bathing water: Christchurch Avon Beach; Christchurch Friar`s Cliff4 spills, 2 hours in 2025
1.6 km away - Wessex Water
Ashley Road Combined Sewer Overflowinto Trib Of River Stour(S)1 spills, 1 hours in 2025
1.7 km away - Wessex Water
Stony Lane Pumping Stationinto The Clockhouse Stream0 spills, 0 hours in 2025
1.4 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
14 planned, approved or being built and 12 running (124 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Royal Bournemouth Hospital, Castle Lane East - Solar PanelsApproved, not yet built
Apr 2025
2.0 km away - Solar farm
Waterditch Farm - Solar Farm & Battery StoragePlanning application in · 50 MW
Jul 2025
3.1 km away - Battery storage
Waterditch Farm - Solar Farm & Battery StoragePlanning application in
Jul 2025
3.1 km away - Solar farm
Parley Court - Solar FarmApproved, not yet built · 35 MW
Jun 2024
5.4 km away - Rooftop solar
Curtiss Wright Controls, Enterprise Way - Solar PanelsApproved, not yet built · 1 MW
Nov 2024
5.6 km away - Rooftop solar
Wimborne Road - Solar PanelsApproved, not yet built · 150 kW
Jun 2025
5.8 km away - Energy from waste
Chapel Lane ERFBeing built · 3 MW
Aug 2024
6.1 km away - Solar farm
Walkford Moor Solar Farm, Walkford Lane - Solar FarmApproved, not yet built · 15 MW
Aug 2024
7.9 km away - Rooftop solar
Sainsburys, Alder Park - Solar panelsApproved, not yet built · 280 kW
May 2025
8.5 km away - Rooftop solar
Sainsburys Supermarket, Ringwood Road - Solar PanelsApproved, not yet built · 430 kW
Mar 2025
8.9 km away - Rooftop solar
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
- Major, planned
Elm Avenue, ChristchurchUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
650 m away - Minor
Sydney Road, ChristchurchHighway improvement works · BOURNEMOUTH, CHRISTCHURCH AND POOLE COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Waterditch Solar Farm (solar farm, 3.1 km); Christchurch Energy (solar farm, 3.1 km); Hale Farm (solar farm, 5.9 km); Eco Composting (biomass, 6.0 km); Woodtown Farm (solar farm, 6.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.