Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
7hours of spills in 2025 between them (typical neighbourhood: about 36)
2spill events counted
Wessex Water
Brook Road Pumping Stationinto Tributary Of The River Stour2 spills, 7 hours in 2025
1.5 km away
Wessex Water
Poole Road Pumping Stationinto River Allen (S)0 spills, 0 hours in 2025
24 planned, approved or being built and 18 running (168 MW between them). Those within 5 km are on the map above.
Rooftop solar
Canford School, Sports Centre - Solar PanelsApproved, not yet built · 220 kW
May 2024 3.1 km away
Battery storage
Whittle Boxland, Whittle Road - Energy Storage FacilityApproved, not yet built · 200 kW
Nov 2022 4.7 km away
Energy from waste
CanfordBeing built · 10 MW
Jan 2015 4.8 km away
Solar farm
Whites Pit, Arena Way - Solar PV ArrayApproved, not yet built · 2 MW
Dec 2023 4.8 km away
Rooftop solar
Ferndown Upper School - Solar ArrayApproved, not yet built · 260 kW
Jan 2022 5.7 km away
Rooftop solar
Cherry Grove - Solar PanelsApproved, not yet built · 240 kW
Jan 2022 5.9 km away
Rooftop solar
David Lloyd Leisure - Solar PanelsApproved, not yet built · 630 kW
Oct 2023 7.2 km away
Battery storage
Mannington Battery Energy Storage SystemBeing built · 50 MW
Apr 2025 7.3 km away
Rooftop solar
Big Yellow Self Storage, Nuffield Road - Solar Photovoltaic PanelsApproved, not yet built · 180 kW
Oct 2022 7.6 km away
Rooftop solar
Sainsburys Supermarket, Ringwood Road - Solar PanelsApproved, not yet built · 430 kW
Mar 2025 7.6 km away
Rooftop solar
Road and street works within 1 km
7 permitted works running now or planned, 4 of them major.
Major, planned
Dogdean, ColehillUtility repair and maintenance works · SOUTH WEST WATER · Road closure
Feb 2027 to Feb 2027 600 m away
Major
Rowlands Hill, Wimborne MinsterUtility asset works · BT · Road closure
Dec 2026 to Dec 2026 800 m away
Major, planned
Yew Tree Close, Wimborne MinsterUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Nov 2026 950 m away
Major
Yew Tree Close, Wimborne MinsterUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Nov 2026 950 m away
Standard
Marlborough Place, Wimborne MinsterUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Nov 2026 to Nov 2026 650 m away
Standard
Westfield Close, Wimborne MinsterUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Oct 2026 1000 m away
Minor
Wimborne Road, Wimborne MinsterHighway improvement works · DORSET COUNCIL · Stop/go boards
Nov 2026 to Nov 2026 400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Colehill: +19% over five years (2020 → 2025).
Council tax list: 130 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.9% in two years.