250new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+9.4%like-for-like prices in Merley, 2024 → 2025 (council -0.1%)
+1%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
15 new homes completedhouses · Nov 2024 – Oct 2026
planned Oct 2026
400 m away - New homes
19 new homes completed1 flats, 18 houses · Sep 2025 – Oct 2026
planned Oct 2026
1.1 km away - New homes
17 new homes completedhouses · Jun 2025 – Oct 2026
planned Oct 2026
650 m away - New homes
6 new homes completedhouses · Mar 2026 – Oct 2026
Oct 2026
600 m away - New homes
32 new homes completedhouses · Nov 2024 – Sep 2026
Sept 2026
600 m away - New homes
26 new homes completedhouses · Nov 2024 – Sep 2026
Sept 2026
450 m away - New homes
20 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
1.1 km away - New homes
15 new homes completedhouses · Nov 2024 – May 2026
May 2026
1.2 km away - New homes
6 new homes completedflats · Feb 2026
Feb 2026
1.0 km away - New homes
6 new homes completedflats · Feb 2026
Feb 2026
1.0 km away - New homes
6 new homes completedflats · Jan 2026
Jan 2026
1.0 km away - New homes
16 new homes completed1 flats, 15 houses · Nov 2024 – Nov 2025
Nov 20251.2 km away
9homes extended 2021–2025, typically adding 21 m²
16since energy certificates began (2008)
1in BH21 1XT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
275hours of spills in 2025 between them (typical neighbourhood: about 36)
54spill events counted
- Wessex Water
Wimborne Water Recycling Centreinto River Stour22 spills, 165 hours in 2025
800 m away - Wessex Water
Hayes Lane Pumping Stationinto Trib Of River Stour26 spills, 91 hours in 2025
1.8 km away - Wessex Water
Canford Main Pumping Stationinto Trib River Stour (S)4 spills, 13 hours in 2025
800 m away - Wessex Water
Brook Road Pumping Stationinto Tributary Of The River Stour2 spills, 7 hours in 2025
1.6 km away - Wessex Water
Poole Road Pumping Stationinto River Allen (S)0 spills, 0 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
24 planned, approved or being built and 17 running (148 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Canford School, Sports Centre - Solar PanelsApproved, not yet built · 220 kW
May 2024
1.2 km away - Energy from waste
CanfordBeing built · 10 MW
Jan 2015
1.8 km away - Solar farm
Whites Pit, Arena Way - Solar PV ArrayApproved, not yet built · 2 MW
Dec 2023
1.9 km away - Battery storage
Whittle Boxland, Whittle Road - Energy Storage FacilityApproved, not yet built · 200 kW
Nov 2022
4.4 km away - Rooftop solar
David Lloyd Leisure - Solar PanelsApproved, not yet built · 630 kW
Oct 2023
4.9 km away - Rooftop solar
Ferndown Upper School - Solar ArrayApproved, not yet built · 260 kW
Jan 2022
4.9 km away - Rooftop solar
Big Yellow Self Storage, Nuffield Road - Solar Photovoltaic PanelsApproved, not yet built · 180 kW
Oct 2022
5.0 km away - Rooftop solar
Cherry Grove - Solar PanelsApproved, not yet built · 240 kW
Jan 2022
5.1 km away - Rooftop solar
The Alpha Centre, Upton Road - Solar PanelsApproved, not yet built · 400 kW
Feb 2023
5.7 km away - Rooftop solar
Fleetspoint Business Centre, Willis Way - Solar PV PanelsPlanning application in · 260 kW
Oct 2024
6.2 km away - Rooftop solar
Road and street works within 1 km
8 permitted works running now or planned, 7 of them major.
- Major, planned
Mountjoy Close, PooleUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Sept 2026 to Oct 2026
400 m away - Major
Mountjoy Close, PooleUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Sept 2026 to Oct 2026
400 m away - Major, planned
Floral Farm, PooleUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Sept 2026 to Oct 2026
450 m away - Major
Floral Farm, PooleUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Sept 2026 to Oct 2026
500 m away - Major
Floral Farm, PooleUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Sept 2026 to Oct 2026
500 m away - Major, planned
Oakley Lane, PooleUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Oct 2026 to Oct 2026
500 m away - Major
Oakley Lane, PooleUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Sept 2026 to Oct 2026
500 m away - Standard
Prow Bridleway 118 Arrowsmith Road To Br24, PooleDisconnection or alteration of supply · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Oct 2026
1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Dorset Green Solar Farm (solar farm, 1.8 km); Dorset Green Battery (battery storage, 1.8 km); Dorset Green Hydrogen (hydrogen, 1.8 km); Whites Landfill Site (Canford) (landfill gas, 1.9 km); Bedborough Farm (solar farm, 4.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.