Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
11storm overflows within 2 km
222hours of spills in 2025 between them (typical neighbourhood: about 36)
89spill events counted
Wessex Water
Stanley Green Road Csointo Creekmoor Lake(Via Sws)35 spills, 70 hours in 2025
1.9 km away
Wessex Water
Moorland Way Pumping Stationinto Lytchett Bay(C) · near bathing water: Poole Harbour Rockley Sands17 spills, 50 hours in 2025
1.9 km away
Wessex Water
Turlin Main Pumping Stationinto Lytchett Bay · near bathing water: Poole Harbour Rockley Sands10 spills, 29 hours in 2025
1.0 km away
Wessex Water
Hinchcliffe Road Csointo Holes Bay Estuarine8 spills, 22 hours in 2025
900 m away
Wessex Water
Kennart Road Pumping Stationinto Holes Bay Via Sws (Estuarine)6 spills, 22 hours in 2025
2.0 km away
Wessex Water
Egmont Road Psinto Lytchett Bay (Sws) Estuarine · near bathing water: Poole Harbour Rockley Sands4 spills, 20 hours in 2025
1.5 km away
Wessex Water
Sandy Lane Psinto Lytchett Bay(E)6 spills, 6 hours in 2025
1.0 km away
Wessex Water
Not Applicableinto Holes Bay Estuarine2 spills, 2 hours in 2025
19 planned, approved or being built and 13 running (65 MW between them). Those within 5 km are on the map above.
Rooftop solar
Rockley Park Caravan Holiday Park, Hamworthy - Solar PanelsApproved, not yet built · 320 kW
Nov 2023 1.4 km away
Rooftop solar
Fleetspoint Business Centre, Willis Way - Solar PV PanelsPlanning application in · 260 kW
Oct 2024 1.9 km away
Rooftop solar
Fleetspoint Business Centre, Willis Way - Solar PV PanelsPlanning application in · 160 kW
Oct 2024 1.9 km away
Rooftop solar
The Alpha Centre, Upton Road - Solar PanelsApproved, not yet built · 400 kW
Feb 2023 2.0 km away
Rooftop solar
David Lloyd Leisure - Solar PanelsApproved, not yet built · 630 kW
Oct 2023 2.8 km away
Rooftop solar
Poole General Hospital, Longfleet Road - Solar PanelsApproved, not yet built · 200 kW
Jun 2023 2.9 km away
Rooftop solar
Poole General Hospital, Longfleet Road - Solar PV ArrayApproved, not yet built · 150 kW
Dec 2023 2.9 km away
Battery storage
Post Farm, Lytchett Minster - Battery Energy StorageApproved, not yet built · 32 MW
Nov 2024 3.0 km away
Rooftop solar
Big Yellow Self Storage, Nuffield Road - Solar Photovoltaic PanelsApproved, not yet built · 180 kW
Oct 2022 3.1 km away
Rooftop solar
Sandford Holiday Park, Organford Road - Solar PanelsApproved, not yet built · 250 kW
Road and street works within 1 km
4 permitted works running now or planned, 1 of them major.
Major
Redhorn Close, PooleUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Sept 2026 to Oct 2026 900 m away
Minor
Blandford Road, PooleUtility asset works · BT · Two-way signals
Oct 2026 to Oct 2026 300 m away
Minor
Turlin Road, PooleUtility repair and maintenance works · WESSEX WATER · Multi-way signals
Oct 2026 to Oct 2026 550 m away
Minor
Coles Avenue, PooleHighway improvement works · BOURNEMOUTH, CHRISTCHURCH AND POOLE COUNCIL · Two-way signals
Oct 2026 to Oct 2026 900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Hamworthy East: +18% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.1% in two years.