Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
105hours of spills in 2025 between them (typical neighbourhood: about 36)
52spill events counted
Wessex Water
Stanley Green Road Csointo Creekmoor Lake(Via Sws)35 spills, 70 hours in 2025
1.5 km away
Wessex Water
Hinchcliffe Road Csointo Holes Bay Estuarine8 spills, 22 hours in 2025
1.8 km away
Wessex Water
Poole Park Csointo Poole Park Boating Lake6 spills, 10 hours in 2025
1.1 km away
Wessex Water
Not Applicableinto Holes Bay Estuarine2 spills, 2 hours in 2025
1.9 km away
Wessex Water
Poole Bridge Pumping Stationinto Backwater Channel,Poole Harb.1 spills, 1 hours in 2025
950 m away
Wessex Water
East Quay Pumping Stationinto Poole Harbour (Estaurine)0 spills, 0 hours in 2025
17 planned, approved or being built and 12 running (60 MW between them). Those within 5 km are on the map above.
Rooftop solar
Poole General Hospital, Longfleet Road - Solar PanelsApproved, not yet built · 200 kW
Jun 2023 900 m away
Rooftop solar
Poole General Hospital, Longfleet Road - Solar PV ArrayApproved, not yet built · 150 kW
Dec 2023 900 m away
Rooftop solar
Fleetspoint Business Centre, Willis Way - Solar PV PanelsPlanning application in · 260 kW
Oct 2024 1.9 km away
Rooftop solar
Fleetspoint Business Centre, Willis Way - Solar PV PanelsPlanning application in · 160 kW
Oct 2024 1.9 km away
Rooftop solar
The Alpha Centre, Upton Road - Solar PanelsApproved, not yet built · 400 kW
Feb 2023 2.6 km away
Rooftop solar
Big Yellow Self Storage, Nuffield Road - Solar Photovoltaic PanelsApproved, not yet built · 180 kW
Oct 2022 2.8 km away
Rooftop solar
David Lloyd Leisure - Solar PanelsApproved, not yet built · 630 kW
Oct 2023 3.3 km away
Rooftop solar
Rockley Park Caravan Holiday Park, Hamworthy - Solar PanelsApproved, not yet built · 320 kW
Nov 2023 3.7 km away
Rooftop solar
Hollywood Bowl Bournemouth Branksome, Poole Road - Solar panelsApproved, not yet built · 180 kW
Dec 2024 4.6 km away
Rooftop solar
Sainsburys, Alder Park - Solar panelsApproved, not yet built · 280 kW
May 20255.4 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
Major
Twin Sails Bridge, PooleHighway repair and maintenance works · BOURNEMOUTH, CHRISTCHURCH AND POOLE COUNCIL · Road closure
Nov 2026 to Nov 2026 950 m away
Standard
Parkstone Road, PooleDisconnection or alteration of supply · SOUTHERN GAS NETWORKS PLC · Two-way signals
Nov 2026 to Dec 2026 650 m away
Minor
Kingland Road - Rear Service Road, PooleHighway improvement works · BOURNEMOUTH, CHRISTCHURCH AND POOLE COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Poole Town: +8% over five years (2020 → 2025).
Council tax list: 70 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.5% in two years.