47new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.4%like-for-like prices in Kinson West, 2024 → 2025 (council -0.1%)
-5%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
19 new homes completed6 flats, 13 houses · Nov 2025 – Oct 2026
Oct 2026
650 m away - New homes
7 new homes completedhouses · Dec 2025 – May 2026
May 2026
550 m away - New homes
5 new homes completedhouses · Dec 2025 – May 2026
May 2026
600 m away - New schoolMar 2023
1.7 km away - New schoolJan 2021
2.0 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
14homes extended 2021–2025, typically adding 35 m²
28since energy certificates began (2008)
0in BH11 9NN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
38hours of spills in 2025 between them (typical neighbourhood: about 36)
13spill events counted
- Wessex Water
Wood Lane Psinto Trib Of The River Stour13 spills, 38 hours in 2025
400 m away - Wessex Water
Pumping Station At Magna Roadinto Knighton Stream(Trib.R.Stour)0 spills, 0 hours in 2025
1.1 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
25 planned, approved or being built and 16 running (135 MW between them). Those within 5 km are on the map above.
- Energy from waste
CanfordBeing built · 10 MW
Jan 2015
2.1 km away - Solar farm
Whites Pit, Arena Way - Solar PV ArrayApproved, not yet built · 2 MW
Dec 2023
2.5 km away - Rooftop solar
Canford School, Sports Centre - Solar PanelsApproved, not yet built · 220 kW
May 2024
3.0 km away - Rooftop solar
Sainsburys, Alder Park - Solar panelsApproved, not yet built · 280 kW
May 2025
3.4 km away - Rooftop solar
Wimborne Road - Solar PanelsApproved, not yet built · 150 kW
Jun 2025
3.7 km away - Solar farm
Parley Court - Solar FarmApproved, not yet built · 35 MW
Jun 2024
4.2 km away - Rooftop solar
Ferndown Upper School - Solar ArrayApproved, not yet built · 260 kW
Jan 2022
4.4 km away - Rooftop solar
Cherry Grove - Solar PanelsApproved, not yet built · 240 kW
Jan 2022
4.4 km away - Battery storage
Whittle Boxland, Whittle Road - Energy Storage FacilityApproved, not yet built · 200 kW
Nov 2022
4.7 km away - Rooftop solar
Hollywood Bowl Bournemouth Branksome, Poole Road - Solar panelsApproved, not yet built · 180 kW
Dec 2024
4.7 km away - Rooftop solar
Big Yellow Self Storage, Nuffield Road - Solar Photovoltaic Panels
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major, planned
Runnymede Avenue, BournemouthUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Dec 2026
650 m away - Major
Runnymede Avenue, BournemouthUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Dec 2026
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Dorset Green Solar Farm (solar farm, 2.0 km); Dorset Green Battery (battery storage, 2.0 km); Dorset Green Hydrogen (hydrogen, 2.0 km); Whites Landfill Site (Canford) (landfill gas, 2.5 km); Woodtown Farm (solar farm, 3.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.