What's changing near BH10 4FR
Within 2 km, around East Howe & Ensbury Park in Bournemouth, Christchurch and Poole. Building, planning, schools, transport, prices and crime.
88new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-0.7%like-for-like prices in East Howe & Ensbury Park, 2024 → 2025 (council -0.1%)
+1%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedhouses · Jul 2025 – Jul 2026
Jul 2026
1.8 km away - New homes
5 new homes completedhouses · Feb 2026 – May 2026
May 2026
200 m away - New homes
27 new homes completedflats · Feb 2026
Feb 2026
1.2 km away - New homes
12 new homes completedflats · Sep 2025
Sept 2025
1.4 km away - School closed
School closed: Talbot House SchoolOther independent school, other independent school (closure)
Aug 2025
1.0 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 27 postcodes nearby had new homes completed in the last two years.
20homes extended 2021–2025, typically adding 25 m²
37since energy certificates began (2008)
0in BH10 4FR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
23 planned, approved or being built and 15 running (148 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Wimborne Road - Solar PanelsApproved, not yet built · 150 kW
Jun 2025
1.2 km away - Rooftop solar
Sainsburys, Alder Park - Solar panelsApproved, not yet built · 280 kW
May 2025
2.1 km away - Solar farm
Parley Court - Solar FarmApproved, not yet built · 35 MW
Jun 2024
2.8 km away - Rooftop solar
Hollywood Bowl Bournemouth Branksome, Poole Road - Solar panelsApproved, not yet built · 180 kW
Dec 2024
3.3 km away - Rooftop solar
Curtiss Wright Controls, Enterprise Way - Solar PanelsApproved, not yet built · 1 MW
Nov 2024
4.4 km away - Energy from waste
CanfordBeing built · 10 MW
Jan 2015
4.8 km away - Rooftop solar
Royal Bournemouth Hospital, Castle Lane East - Solar PanelsApproved, not yet built
Apr 2025
5.0 km away - Energy from waste
Chapel Lane ERFBeing built · 3 MW
Aug 2024
5.0 km away - Solar farm
Whites Pit, Arena Way - Solar PV ArrayApproved, not yet built · 2 MW
Dec 2023
5.2 km away - Rooftop solar
Canford School, Sports Centre - Solar PanelsApproved, not yet built · 220 kW
May 2024
6.0 km away - Rooftop solar
Cherry Grove - Solar Panels
Road and street works within 1 km
4 permitted works running now or planned, 4 of them major.
- Major
Columbia Road, BournemouthSection 50 · BOURNEMOUTH, CHRISTCHURCH AND POOLE COUNCIL · Road closure
Oct 2026 to Nov 2026
50 m away - Major, planned
Barnes Road, BournemouthUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Jan 2027 to Jan 2027
400 m away - Major, planned
Delhi Road, BournemouthUtility repair and maintenance works · WESSEX WATER · Road closure
Nov 2026 to Dec 2026
750 m away - Major
Delhi Road, BournemouthUtility repair and maintenance works · WESSEX WATER · Road closure
Nov 2026 to Dec 2026
750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
No nationally significant infrastructure projects within 30 km.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Woodtown Farm (solar farm, 3.1 km); Hale Farm (solar farm, 3.5 km); Eco Composting (biomass, 4.5 km); Dorset Green Solar Farm (solar farm, 4.7 km); Dorset Green Battery (battery storage, 4.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.