16new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+18.6%like-for-like prices in Chellow Heights, 2024 → 2025 (council +5.1%)
+0%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
15homes extended 2021–2025, typically adding 22 m²
70since energy certificates began (2008)
2in BD9 6QL itself
- Extendedcertificate 2026
- Extendedcertificate 2013
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
82hours of spills in 2025 between them (typical neighbourhood: about 36)
92spill events counted
- Yorkshire Water
Allerton Road Csointo Chellow Dean Beck39 spills, 45 hours in 2025
1.6 km away - Yorkshire Water
Manor Drive Csointo Cottingley Beck33 spills, 14 hours in 2025
1.6 km away - Yorkshire Water
Main Street No 2 Csointo Cottingley Beck13 spills, 12 hours in 2025
1.2 km away - Yorkshire Water
Walden Drive No 2 Csointo Clvrt Trib Of Cliff Dike7 spills, 11 hours in 2025
500 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
47 planned, approved or being built and 3 running (22 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar PanelsApproved, not yet built · 260 kW
Apr 2024
2.1 km away - Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar panelsApproved, not yet built · 160 kW
Jul 2024
2.1 km away - Rooftop solar
St James Church Primary School, Chelwood Drive - Solar Photovoltaic PanelsApproved, not yet built · 150 kW
Jan 2024
2.5 km away - Rooftop solar
The Early Music Shop, Salts Mill - Solar PanelsApproved, not yet built · 160 kW
Dec 2024
2.9 km away - Rooftop solar
Morrisons, Thornton Road - Solar PV PanelsApproved, not yet built · 900 kW
Mar 2022
2.9 km away - Battery storage
Stor Generation Plant - Battery StorageApproved, not yet built · 12 MW
Apr 2025
3.0 km away - Battery storage
Bradford West, Harrop Lane, Wilsden - Battery StorageApproved, not yet built · 100 MW
May 2023
3.1 km away - Rooftop solar
The Waterfront, Salts Mill Road - Solar PanelsApproved, not yet built
May 2024
3.1 km away - Rooftop solar
James Walker Moorflex - Solar PanelsApproved, not yet built
Aug 2022
3.1 km away - Battery storage
Bradford West Substation (Harrop Edge Farm)Being built · 50 MW
Jul 2022
3.1 km away
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major, planned
Aygill Avenue, BradfordUtility repair and maintenance works · YORKSHIRE WATER · Road closure
Jan 2027 to Jan 2027
600 m away - Major
Aygill Avenue, BradfordUtility repair and maintenance works · YORKSHIRE WATER · Road closure
Jan 2027 to Jan 2027
600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
15.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 5.6 km); Esholt WWTW (other, 7.5 km); Ovenden Moor (Repower) (wind farm, 8.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.