Country England and Wales › Region Yorkshire and The Humber › Council Bradford › Neighbourhood Frizinghall & Heaton Grove › Postcode BD9 4JY What's changing near BD9 4JY Within 2 km, around Frizinghall & Heaton Grove in Bradford. Building, planning, schools, transport, prices and crime.
104 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+7.4% like-for-like prices in Frizinghall & Heaton Grove, 2024 → 2025 (council +5.1%)
+5% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 26 new homes completed 18 flats, 8 houses · Feb 2026
Feb 2026 1.8 km away New homes 16 new homes completed flats · Jul 2025
Jul 2025 1.8 km away New homes 12 new homes completed houses · Mar 2025 – Jul 2025
Jul 2025 800 m away New homes 24 new homes completed houses · Jan 2025 – May 2025
May 2025 850 m away School closed School closed: J.A.M.E.S Other independent special school, other independent special school (closure)
Jul 2023 250 m away New school New school: Hanson Academy Academy sponsor led, secondary
Jul 2022 1.9 km away School closed School closed: Netherleigh and Rossefield School Other independent school, other independent school (closure)
Dec 2021 750 m away School closed School closed: Tracks Pupil referral unit, pupil referral unit (closure)
Aug 2020 1.7 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
13 homes extended 2021–2025, typically adding 28 m²
83 since energy certificates began (2008)
5 in BD9 4JY itself
Extended certificate 2017 Extended certificate 2016 Extended certificate 2016 Extended certificate 2016 Extended certificate 2013 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 15 storm overflows within 2 km
1,192 hours of spills in 2025 between them (typical neighbourhood: about 36)
310 spill events counted
Yorkshire Water Canal Road Frizinghall Cso into Bradford Beck 100 spills, 618 hours in 2025
500 m away Yorkshire Water North Avenue Cso into Bradford Beck 25 spills, 239 hours in 2025
1.2 km away Yorkshire Water Dock Lane Cso into Bradford Beck 67 spills, 153 hours in 2025
1.8 km away Yorkshire Water Yorkshire Water Frizley Gardens Bra into Bradford Beck 36 spills, 97 hours in 2025
350 m away Yorkshire Water Ashbourne Road Cso into Bolton Beck 28 spills, 46 hours in 2025
1.8 km away Yorkshire Water Bradford Beck 2 Cso into Bradford Beck 8 spills, 10 hours in 2025
1.3 km away Yorkshire Water Powell Road Cso into Trap Sike 13 spills, 9 hours in 2025
600 m away Yorkshire Water Valley Road Shipley 2 Cso into Bradford Beck 13 spills, 6 hours in 2025
700 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 47 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Rooftop solar The University Of Bradford Stadium - Solar Panels Approved, not yet built · 200 kW
Feb 2024 1.7 km away Battery storage Midland Road - Battery Energy Storage Approved, not yet built · 80 MW
Dec 2024 1.9 km away Rooftop solar Bradford Girls Grammar School, Squire Lane - Solar Panels Approved, not yet built · 260 kW
Apr 2024 2.2 km away Rooftop solar Bradford Girls Grammar School, Squire Lane - Solar panels Approved, not yet built · 160 kW
Jul 2024 2.2 km away Rooftop solar The Waterfront, Salts Mill Road - Solar Panels Approved, not yet built
May 2024 2.3 km away Rooftop solar Morrisons, Thornton Road - Solar PV Panels Approved, not yet built · 900 kW
Mar 2022 2.5 km away Rooftop solar The Early Music Shop, Salts Mill - Solar Panels Approved, not yet built · 160 kW
Dec 2024 2.5 km away Battery storage Stor Generation Plant - Battery Storage Approved, not yet built · 12 MW
Apr 2025 2.8 km away Rooftop solar University of Bradford, Richmond Road - Solar Panels Approved, not yet built · 400 kW
Nov 2022 3.0 km away Rooftop solar Marston House, Otley Road - Solar Panels Approved, not yet built · 3 MW
May 2023 3.3 km away Road and street works within 1 km 13 permitted works running now or planned, 7 of them major.
Major, planned Wood Road, Bradford Utility repair and maintenance works · YORKSHIRE WATER · Road closure
Dec 2026 to Dec 2026 100 m away Major Wood Road, Bradford Utility repair and maintenance works · YORKSHIRE WATER · Road closure
Dec 2026 to Dec 2026 100 m away Major Park View Terrace, Bradford Utility repair and maintenance works · YORKSHIRE WATER · Road closure
Jan 2027 to Jan 2027 800 m away Major, planned Cunliffe Terrace, Bradford Utility repair and maintenance works · YORKSHIRE WATER · Road closure
Nov 2026 to Nov 2026 850 m away Major Cunliffe Terrace, Bradford Utility repair and maintenance works · YORKSHIRE WATER · Road closure
Nov 2026 to Nov 2026 850 m away Major, planned Festival Avenue, Shipley Utility repair and maintenance works · NORTHERN POWERGRID (YORKSHIRE) PLC · Road closure
Nov 2026 to Dec 2026 900 m away Major Heaton Road, Bradford Utility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Multi-way signals
Nov 2026 to Dec 2026 900 m away Standard Ashfield Grove, Shipley Utility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Nov 2026 650 m away Standard Grove Avenue, Shipley New service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Jan 2027 to Jan 2027 750 m away Major infrastructure projects within 30 km Pre-application Calderdale Energy Park Generating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026 18.6 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 2.8 km); Esholt WWTW (other, 5.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.