Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
17storm overflows within 2 km
1,326hours of spills in 2025 between them (typical neighbourhood: about 36)
47 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Rooftop solar
The University Of Bradford Stadium - Solar PanelsApproved, not yet built · 200 kW
Feb 2024 1.9 km away
Battery storage
Midland Road - Battery Energy StorageApproved, not yet built · 80 MW
Dec 2024 2.1 km away
Rooftop solar
The Waterfront, Salts Mill Road - Solar PanelsApproved, not yet built
May 2024 2.1 km away
Rooftop solar
The Early Music Shop, Salts Mill - Solar PanelsApproved, not yet built · 160 kW
Dec 2024 2.3 km away
Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar PanelsApproved, not yet built · 260 kW
Apr 2024 2.4 km away
Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar panelsApproved, not yet built · 160 kW
Jul 2024 2.4 km away
Rooftop solar
Morrisons, Thornton Road - Solar PV PanelsApproved, not yet built · 900 kW
Mar 2022 2.7 km away
Battery storage
Stor Generation Plant - Battery StorageApproved, not yet built · 12 MW
Apr 2025 3.0 km away
Rooftop solar
Marston House, Otley Road - Solar PanelsApproved, not yet built · 3 MW
May 2023 3.0 km away
Rooftop solar
University of Bradford, Richmond Road - Solar PanelsApproved, not yet built · 400 kW
Nov 2022 3.2 km away
Road and street works within 1 km
8 permitted works running now or planned, 3 of them major.
Major, planned
Wood Road, BradfordUtility repair and maintenance works · YORKSHIRE WATER · Road closure
Dec 2026 to Dec 2026 150 m away
Major
Wood Road, BradfordUtility repair and maintenance works · YORKSHIRE WATER · Road closure
Dec 2026 to Dec 2026 150 m away
Major, planned
Festival Avenue, ShipleyUtility repair and maintenance works · NORTHERN POWERGRID (YORKSHIRE) PLC · Road closure
Nov 2026 to Dec 2026 650 m away
Standard
Ashfield Grove, ShipleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Nov 2026 650 m away
Standard
Grove Avenue, ShipleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Jan 2027 to Jan 2027 650 m away
Standard
Parsons Road, BradfordUtility asset works · LAST MILE ELECTRICITY LIMITED (Formerly GLOBAL UTILITY CONNECTIONS) · Give and take
Oct 2026 to Oct 2026 900 m away
Standard
Ashwell Road, BradfordUtility asset works · LAST MILE ELECTRICITY LIMITED (Formerly GLOBAL UTILITY CONNECTIONS) · Give and take
Oct 2026 to Oct 2026 950 m away
Minor
Park Drive, BradfordUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 18.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Frizinghall & Heaton Grove: +33% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -4.2% in two years.