What's changing near BD8 7LX
Within 2 km, around Manningham & Lister Park in Bradford. Building, planning, schools, transport, prices and crime.
161new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-3.0%like-for-like prices in Manningham & Lister Park, 2024 → 2025 (council +5.1%)
+2%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
26 new homes completedhouses · Nov 2024 – Aug 2026
Aug 2026
2.0 km away - New homes
9 new homes completedflats · Jun 2026
Jun 2026
1.7 km away - New homes
12 new homes completedhouses · Mar 2025 – Jul 2025
Jul 2025
1.8 km away - New homes
24 new homes completedhouses · Jan 2025 – May 2025
May 2025
1.9 km away - New homes
51 new homes completedflats · Feb 2025
Feb 2025
1.9 km away - New homes
5 new homes completedflats · Feb 2025
Feb 2025
1.3 km away - School closed
School closed: J.A.M.E.SOther independent special school, other independent special school (closure)
Jul 2023
1.3 km away - School closed
School closed: TLG BradfordOther independent school, other independent school (closure)
Nov 2022
1.9 km away - School closed
School closed: Netherleigh and Rossefield SchoolOther independent school, other independent school (closure)
Dec 2021
1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 20 postcodes nearby had new homes completed in the last two years.
8homes extended 2021–2025, typically adding 37 m²
161since energy certificates began (2008)
6in BD8 7LX itself
- Extendedcertificate 2017
- Extendedcertificate 2016
- Extendedcertificate 2016
- Extendedcertificate 2016
- Extendedcertificate 2016
- Extendedcertificate 2015
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
20storm overflows within 2 km
1,479hours of spills in 2025 between them (typical neighbourhood: about 36)
439spill events counted
- Yorkshire Water
Canal Road Frizinghall Csointo Bradford Beck100 spills, 618 hours in 2025
950 m away - Yorkshire Water
North Avenue Csointo Bradford Beck25 spills, 239 hours in 2025
700 m away - Yorkshire Water
Longside Lane Hall Csointo Westbrook34 spills, 178 hours in 2025
1.7 km away - Yorkshire Water
Little Horton Lane Csointo Bradford Beck70 spills, 132 hours in 2025
2.0 km away - Yorkshire Water
Yorkshire Water Frizley Gardens Brainto Bradford Beck36 spills, 97 hours in 2025
1.2 km away - Yorkshire Water
Preston Street Csointo Bradford Beck40 spills, 76 hours in 2025
1.3 km away - Yorkshire Water
Ashbourne Road Csointo Bolton Beck28 spills, 46 hours in 2025
1.5 km away - Yorkshire Water
North Brook Street No 1 Csointo Bradford Beck (Culverted)39 spills, 45 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
47 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
- Rooftop solar
The University Of Bradford Stadium - Solar PanelsApproved, not yet built · 200 kW
Feb 2024
850 m away - Battery storage
Midland Road - Battery Energy StorageApproved, not yet built · 80 MW
Dec 2024
1000 m away - Rooftop solar
Morrisons, Thornton Road - Solar PV PanelsApproved, not yet built · 900 kW
Mar 2022
1.7 km away - Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar PanelsApproved, not yet built · 260 kW
Apr 2024
1.8 km away - Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar panelsApproved, not yet built · 160 kW
Jul 2024
1.8 km away - Rooftop solar
University of Bradford, Richmond Road - Solar PanelsApproved, not yet built · 400 kW
Nov 2022
1.9 km away - Battery storage
Stor Generation Plant - Battery StorageApproved, not yet built · 12 MW
Apr 2025
2.0 km away - Rooftop solar
Trafalgar House Police Station - Installation Of Solar PV SystemBeing built
Sept 2023
2.6 km away - Rooftop solar
Bow Beck Bowling, Back Lane - Solar PanelsApproved, not yet built · 180 kW
Jun 2023
3.1 km away - Other
Bradford Low Carbon HydrogenApproved, not yet built
Apr 2024
3.2 km away
Road and street works within 1 km
8 permitted works running now or planned, 5 of them major.
- Major, planned
Manningham Lane, BradfordHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Multi-way signals
Sept 2026 to Nov 2026
350 m away - Major, planned
Cunliffe Terrace, BradfordUtility repair and maintenance works · YORKSHIRE WATER · Road closure
Nov 2026 to Nov 2026
400 m away - Major
Cunliffe Terrace, BradfordUtility repair and maintenance works · YORKSHIRE WATER · Road closure
Nov 2026 to Nov 2026
400 m away - Major
Park View Terrace, BradfordUtility repair and maintenance works · YORKSHIRE WATER · Road closure
Jan 2027 to Jan 2027
550 m away - Major
Heaton Road, BradfordUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Multi-way signals
Nov 2026 to Dec 2026
850 m away - Standard
Cunliffe Road, BradfordDisconnection or alteration of supply · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026
300 m away - Standard
North Avenue, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Oct 2026 to Oct 2026
550 m away - Standard
Arthington Street, BradfordDisconnection or alteration of supply · NORTHERN GAS NETWORKS · Some carriageway incursion
Oct 2026 to Nov 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
18.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 3.1 km); Esholt WWTW (other, 5.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.