What's changing near BD8 0DB
Within 2 km, around Fairweather Green in Bradford. Building, planning, schools, transport, prices and crime.
54new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+13.9%like-for-like prices in Fairweather Green, 2024 → 2025 (council +5.1%)
-0%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 12 postcodes nearby had new homes completed in the last two years.
13homes extended 2021–2025, typically adding 41 m²
64since energy certificates began (2008)
1in BD8 0DB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
303hours of spills in 2025 between them (typical neighbourhood: about 36)
121spill events counted
- Yorkshire Water
Thornton Road 209 Csointo Pitty Beck67 spills, 236 hours in 2025
1.5 km away - Yorkshire Water
Allerton Road Csointo Chellow Dean Beck39 spills, 45 hours in 2025
250 m away - Yorkshire Water
Bradford Road 213 Csointo Clayton Beck8 spills, 11 hours in 2025
1.9 km away - Yorkshire Water
Walden Drive No 2 Csointo Clvrt Trib Of Cliff Dike7 spills, 11 hours in 2025
1.3 km away - Yorkshire Water
Arthur Avenue Csointo Middle Brook0 spills, 0 hours in 2025
1.1 km away - Yorkshire Water
Charteris Road Csointo Pitty Beck0 spills, 0 hours in 2025
1.1 km away - Yorkshire Water
Thorton Grammar Csointo Clayton Beck0 spills, 0 hours in 2025
1.2 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
47 planned, approved or being built and 3 running (22 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar PanelsApproved, not yet built · 260 kW
Apr 2024
800 m away - Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar panelsApproved, not yet built · 160 kW
Jul 2024
800 m away - Rooftop solar
St James Church Primary School, Chelwood Drive - Solar Photovoltaic PanelsApproved, not yet built · 150 kW
Jan 2024
1.3 km away - Battery storage
Stor Generation Plant - Battery StorageApproved, not yet built · 12 MW
Apr 2025
1.4 km away - Rooftop solar
Morrisons, Thornton Road - Solar PV PanelsApproved, not yet built · 900 kW
Mar 2022
1.5 km away - Rooftop solar
Clayton Ce Primary School - Solar PanelsApproved, not yet built · 200 kW
Jan 2024
2.1 km away - Rooftop solar
The University Of Bradford Stadium - Solar PanelsApproved, not yet built · 200 kW
Feb 2024
3.3 km away - Rooftop solar
University of Bradford, Richmond Road - Solar PanelsApproved, not yet built · 400 kW
Nov 2022
3.3 km away - Battery storage
Midland Road - Battery Energy StorageApproved, not yet built · 80 MW
Dec 2024
3.4 km away - Battery storage
Bradford West Substation (Harrop Edge Farm)Being built · 50 MW
Jul 2022
3.6 km away
Road and street works within 1 km
9 permitted works running now or planned, 2 of them major.
- Major, planned
Chippendale Rise, BradfordHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · No carriageway incursion
Oct 2026 to Nov 2026
200 m away - Major
Daisy Hill Lane, BradfordOptional permit (no fee) e.g. for traffic management etc · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Stop/go boards
Jan 2027 to Jan 2027
950 m away - Standard
Bronshill Grove, BradfordDisconnection or alteration of supply · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026
350 m away - Standard
Sherwell Rise, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Jan 2027 to Jan 2027
500 m away - Standard
Ings Way, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Dec 2026 to Dec 2026
650 m away - Standard
Colston Close, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Nov 2026 to Nov 2026
650 m away - Standard
Wanstead Crescent, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Nov 2026 to Nov 2026
750 m away - Standard
Daisy Hill Lane, BradfordOptional permit (no fee) e.g. for traffic management etc · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Stop/go boards
Nov 2026 to Nov 2026
950 m away - Minor
Thornton Road, BradfordDiversionary works · BT · Some carriageway incursion
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
16.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 5.6 km); Esholt WWTW (other, 8.0 km); Ovenden Moor (Repower) (wind farm, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.