What's changing near BD6 3XD
Within 2 km, around Scholemoor in Bradford. Building, planning, schools, transport, prices and crime.
14new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.3%like-for-like prices in Scholemoor, 2024 → 2025 (council +5.1%)
+7%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
18homes extended 2021–2025, typically adding 23 m²
72since energy certificates began (2008)
2in BD6 3XD itself
- Extendedcertificate 2019
- Extendedcertificate 2014
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
514hours of spills in 2025 between them (typical neighbourhood: about 36)
161spill events counted
- Yorkshire Water
Lidget Fm/Lower Lidget Fm Cso'Sinto Bull Greave Beck14 spills, 150 hours in 2025
1.8 km away - Yorkshire Water
Green End No 2 Csointo Trib Of Clayton Beck (Culvert)13 spills, 125 hours in 2025
1.6 km away - Yorkshire Water
Thearne Green Csointo Bull Greave Beck55 spills, 104 hours in 2025
1.3 km away - Yorkshire Water
Pasture Lane No 2 Csointo Bull Greave Beck (Culverted)37 spills, 79 hours in 2025
1.5 km away - Yorkshire Water
Edge End Lane Csointo Blackshaw Beck16 spills, 23 hours in 2025
1.5 km away - Yorkshire Water
Hillcrest Road No 2 Csointo Trib Of Shibden Brook14 spills, 15 hours in 2025
1.9 km away - Yorkshire Water
Bradford Road 213 Csointo Clayton Beck8 spills, 11 hours in 2025
1.7 km away - Yorkshire Water
Brackenhill Park No. 2 Csointo Horton Beck (Culverted)4 spills, 7 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
44 planned, approved or being built and 2 running (19 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Clayton Ce Primary School - Solar PanelsApproved, not yet built · 200 kW
Jan 2024
1.5 km away - Rooftop solar
St James Church Primary School, Chelwood Drive - Solar Photovoltaic PanelsApproved, not yet built · 150 kW
Jan 2024
3.0 km away - Battery storage
Stor Generation Plant - Battery StorageApproved, not yet built · 12 MW
Apr 2025
3.2 km away - Battery storage
Holmfield - Battery Energy StorageBeing built · 250 kW
Mar 2023
3.5 km away - Rooftop solar
Morrisons, Thornton Road - Solar PV PanelsApproved, not yet built · 900 kW
Mar 2022
3.5 km away - Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar PanelsApproved, not yet built · 260 kW
Apr 2024
3.9 km away - Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar panelsApproved, not yet built · 160 kW
Jul 2024
3.9 km away - Battery storage
Holmfield Battery StorageApproved, not yet built · 500 MW
May 2025
3.9 km away - Biomass
Ernest Gill And Son, Holmfield Industrial Estate - Biomass BoilerApproved, not yet built · 190 kW
Sept 2022
3.9 km away - Rooftop solar
Sedbergh Sports and Leisure Centre - Solar PV InstallationBeing built · 200 kW
Mar 2026
3.9 km away
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
- Major, planned
Torre Road, BradfordHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Dec 2026 to Dec 2026
700 m away - Standard
Cooper Lane, BradfordHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Stop/go boards
Oct 2026 to Nov 2026
450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
15.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Ovenden Moor (Repower) (wind farm, 7.7 km); Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.