Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
49hours of spills in 2025 between them (typical neighbourhood: about 36)
38spill events counted
Yorkshire Water
Woodfall Shelf East 2 Csointo Brow Lane Sewer22 spills, 26 hours in 2025
1.5 km away
Yorkshire Water
Edge End Lane Csointo Blackshaw Beck16 spills, 23 hours in 2025
46 planned, approved or being built and 2 running (19 MW between them). Those within 5 km are on the map above.
Rooftop solar
Clayton Ce Primary School - Solar PanelsApproved, not yet built · 200 kW
Jan 2024 2.7 km away
Rooftop solar
Sedbergh Sports and Leisure Centre - Solar PV InstallationBeing built · 200 kW
Mar 2026 2.8 km away
Rooftop solar
Appleton Academy, Woodside Road - Solar PanelsApproved, not yet built · 230 kW
Nov 2024 3.0 km away
Rooftop solar
St Matthews CE Primary School, Ivy House Road - Solar PanelsPlanning application in · 180 kW
Jun 2026 3.3 km away
Battery storage
Stor Generation Plant - Battery StorageApproved, not yet built · 12 MW
Apr 2025 3.7 km away
Rooftop solar
Morrisons, Thornton Road - Solar PV PanelsApproved, not yet built · 900 kW
Mar 2022 4.0 km away
Rooftop solar
University of Bradford, Richmond Road - Solar PanelsApproved, not yet built · 400 kW
Nov 2022 4.2 km away
Rooftop solar
St James Church Primary School, Chelwood Drive - Solar Photovoltaic PanelsApproved, not yet built · 150 kW
Jan 2024 4.2 km away
Battery storage
Holmfield - Battery Energy StorageBeing built · 250 kW
Mar 2023 4.2 km away
Rooftop solar
Roydsdale Way, Unit 6 - Solar PanelApproved, not yet built · 2 MW
Mar 2026 4.3 km away
Road and street works within 1 km
10 permitted works running now or planned, 5 of them major.
Major, planned
Boltby Lane, BradfordCore Sampling · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Stop/go boards
Oct 2026 to Nov 2026 100 m away
Major, planned
Collingham Avenue, BradfordHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Dec 2026 to Dec 2026 100 m away
Major, planned
Boltby Lane, BradfordHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Nov 2026 to Dec 2026 100 m away
Major, planned
Torre Road, BradfordHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Dec 2026 to Dec 2026 750 m away
Major
Farringdon Grove, BradfordUtility repair and maintenance works · YORKSHIRE WATER · Road closure
Oct 2026 to Oct 2026 950 m away
Standard
Farfield Avenue, BradfordUtility repair and maintenance works · O2 (UK) LIMITED · Two-way signals
Oct 2026 to Oct 2026 450 m away
Standard
Halifax Road, BradfordHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Stop/go boards
Oct 2026 to Nov 2026 650 m away
Standard
Wibsey Park Avenue, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Nov 2026 to Nov 2026 800 m away
Minor
Welburn Mount, BradfordUtility asset works · BT · Some carriageway incursion
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 17.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Buttershaw: +39% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.7% in two years.