Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
8hours of spills in 2025 between them (typical neighbourhood: about 36)
17spill events counted
Yorkshire Water
Cleckheaton Road Csointo Tributary Of Low Moor Beck17 spills, 8 hours in 2025
1.1 km away
Yorkshire Water
Smith Avenue Csointo Tributary Of Low Moor Beck0 spills, 0 hours in 2025
200 m away
Yorkshire Water
Rooley Avenue Csointo Dean Beck0 spills, 0 hours in 2025
700 m away
Yorkshire Water
Common Road Csointo Tributary Of Low Moor Beck0 spills, 0 hours in 2025
1.4 km away
Yorkshire Water
Upper Park House Csointo Low Moor Beck0 spills, 0 hours in 2025
1.5 km away
Yorkshire Water
Birch Lane Csointo Tributary Of Bowling Beck0 spills, 0 hours in 2025
57 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Rooftop solar
Sedbergh Sports and Leisure Centre - Solar PV InstallationBeing built · 200 kW
Mar 2026 950 m away
Rooftop solar
St Matthews CE Primary School, Ivy House Road - Solar PanelsPlanning application in · 180 kW
Jun 2026 1.1 km away
Rooftop solar
Roydsdale Way, Unit 6 - Solar PanelApproved, not yet built · 2 MW
Mar 2026 2.5 km away
Rooftop solar
Trafalgar House Police Station - Installation Of Solar PV SystemBeing built
Sept 2023 2.6 km away
Rooftop solar
Appleton Academy, Woodside Road - Solar PanelsApproved, not yet built · 230 kW
Nov 2024 2.7 km away
Rooftop solar
University of Bradford, Richmond Road - Solar PanelsApproved, not yet built · 400 kW
Nov 2022 2.8 km away
Rooftop solar
Bradford Forster Academy - Solar PanelsApproved, not yet built · 380 kW
Mar 2024 3.1 km away
Rooftop solar
Bow Beck Bowling, Back Lane - Solar PanelsApproved, not yet built · 180 kW
Jun 2023 3.2 km away
Battery storage
Stor Generation Plant - Battery StorageApproved, not yet built · 12 MW
Apr 2025 3.5 km away
Rooftop solar
Morrisons, Thornton Road - Solar PV PanelsApproved, not yet built · 900 kW
Mar 2022 3.6 km away
Road and street works within 1 km
6 permitted works running now or planned.
Standard
Wibsey Bank, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Nov 2026 to Nov 2026 250 m away
Standard
Carisbrooke Crescent, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · No carriageway incursion
Nov 2026 to Nov 2026 550 m away
Standard
Laithe Grove, BradfordDisconnection or alteration of supply · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026 850 m away
Standard
Union Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Nov 2026 950 m away
Minor
Odsal Interchange, BradfordUtility asset works · NORTHERN POWERGRID (YORKSHIRE) PLC · Lane closure
Jan 2027 to Jan 2027 550 m away
Minor
Smiddles Lane, BradfordUtility repair and maintenance works · YORKSHIRE WATER · Two-way signals
Oct 2026 to Oct 2026 700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 19.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Bankfoot: +41% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.5% in two years.