What's changing near BD6 1HE
Within 2 km, around Bankfoot in Bradford. Building, planning, schools, transport, prices and crime.
138new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+9.0%like-for-like prices in Bankfoot, 2024 → 2025 (council +5.1%)
-8%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
33 new homes completedhouses · Apr 2026 – Aug 2026
Aug 2026
1.6 km away - New homes
25 new homes completedhouses · Aug 2025 – Aug 2026
Aug 2026
1.5 km away - New homes
27 new homes completedhouses · May 2026
Jun 2026
1.6 km away - New homes
9 new homes completedhouses · Mar 2026 – May 2026
May 2026
1.6 km away - New homes
12 new homes completedhouses · Jan 2026 – Feb 2026
Feb 2026
1.6 km away - New homes
5 new homes completedhouses · Nov 2025
Dec 2025
1.5 km away - New homes
6 new homes completedhouses · Aug 2025
Aug 2025
1.5 km away - New homes
5 new homes completedhouses · Jul 2025
Jul 2025
1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 18 postcodes nearby had new homes completed in the last two years.
13homes extended 2021–2025, typically adding 28 m²
29since energy certificates began (2008)
1in BD6 1HE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
8hours of spills in 2025 between them (typical neighbourhood: about 36)
17spill events counted
- Yorkshire Water
Cleckheaton Road Csointo Tributary Of Low Moor Beck17 spills, 8 hours in 2025
1.1 km away - Yorkshire Water
Smith Avenue Csointo Tributary Of Low Moor Beck0 spills, 0 hours in 2025
250 m away - Yorkshire Water
Rooley Avenue Csointo Dean Beck0 spills, 0 hours in 2025
900 m away - Yorkshire Water
Common Road Csointo Tributary Of Low Moor Beck0 spills, 0 hours in 2025
1.2 km away - Yorkshire Water
Upper Park House Csointo Low Moor Beck0 spills, 0 hours in 2025
1.6 km away - Yorkshire Water
Birch Lane Csointo Tributary Of Bowling Beck0 spills, 0 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
57 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Sedbergh Sports and Leisure Centre - Solar PV InstallationBeing built · 200 kW
Mar 2026
1.0 km away - Rooftop solar
St Matthews CE Primary School, Ivy House Road - Solar PanelsPlanning application in · 180 kW
Jun 2026
1.4 km away - Rooftop solar
Appleton Academy, Woodside Road - Solar PanelsApproved, not yet built · 230 kW
Nov 2024
2.5 km away - Rooftop solar
Roydsdale Way, Unit 6 - Solar PanelApproved, not yet built · 2 MW
Mar 2026
2.6 km away - Rooftop solar
Trafalgar House Police Station - Installation Of Solar PV SystemBeing built
Sept 2023
2.9 km away - Rooftop solar
University of Bradford, Richmond Road - Solar PanelsApproved, not yet built · 400 kW
Nov 2022
3.0 km away - Rooftop solar
Bradford Forster Academy - Solar PanelsApproved, not yet built · 380 kW
Mar 2024
3.4 km away - Rooftop solar
Bow Beck Bowling, Back Lane - Solar PanelsApproved, not yet built · 180 kW
Jun 2023
3.5 km away - Battery storage
Stor Generation Plant - Battery StorageApproved, not yet built · 12 MW
Apr 2025
3.6 km away - Rooftop solar
Clayton Ce Primary School - Solar PanelsApproved, not yet built · 200 kW
Jan 2024
3.6 km away
Road and street works within 1 km
11 permitted works running now or planned, 3 of them major.
- Major
Park Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Nov 2026 to Dec 2026
850 m away - Major, planned
Beacon Road, BradfordUtility asset works · NORTHERN POWERGRID (YORKSHIRE) PLC · Two-way signals
Sept 2026 to Oct 2026
1000 m away - Major
Beacon Road, BradfordUtility asset works · NORTHERN POWERGRID (YORKSHIRE) PLC · Two-way signals
Sept 2026 to Oct 2026
1000 m away - Standard
Carisbrooke Crescent, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · No carriageway incursion
Nov 2026 to Nov 2026
250 m away - Standard
Wibsey Bank, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Nov 2026 to Nov 2026
550 m away - Standard
Union Road, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Nov 2026
700 m away - Standard
Laithe Grove, BradfordDisconnection or alteration of supply · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026
800 m away - Standard
Fountain Street, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Nov 2026
950 m away - Standard
School Street, BradfordUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Dec 20261000 m away
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
18.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 7.2 km); Esholt WWTW (other, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.