What's changing near BD4 9PH
Within 2 km, around Laisterdyke & Bowling in Bradford. Building, planning, schools, transport, prices and crime.
215new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.5%like-for-like prices in Laisterdyke & Bowling, 2024 → 2025 (council +5.1%)
-1%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
39 new homes completedhouses · Feb 2026 – Oct 2026
Oct 2026
1.4 km away - New homes
24 new homes completedhouses · Dec 2025 – Oct 2026
Oct 2026
1.1 km away - New homes
10 new homes completedhouses · Dec 2025 – Sep 2026
Sept 2026
1.1 km away - New homes
5 new homes completedhouses · May 2026 – Sep 2026
Sept 2026
1.2 km away - New homes
33 new homes completedhouses · Apr 2026 – Aug 2026
Aug 2026
1.9 km away - New homes
5 new homes completedhouses · Jun 2026
Jun 2026
1.6 km away - New homes
8 new homes completedhouses · Mar 2026 – Jun 2026
Jun 2026
1.5 km away - New homes
9 new homes completedhouses · Mar 2026 – May 2026
May 2026
2.0 km away - New homes
5 new homes completedhouses · Apr 2026
Apr 2026
1.4 km away - New homes
12 new homes completedhouses · Feb 2026
Mar 2026
1.4 km away - New homes
14 new homes completedhouses · Feb 2026
Mar 2026
1.4 km away - New homes
6 new homes completedhouses · Mar 2026
Mar 2026
1.2 km away
3homes extended 2021–2025, typically adding 31 m²
47since energy certificates began (2008)
0in BD4 9PH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
570hours of spills in 2025 between them (typical neighbourhood: about 36)
263spill events counted
- Yorkshire Water
Bower Grn/Chestnut St/Myrtle St/into East Brook (Culverted)78 spills, 286 hours in 2025
2.0 km away - Yorkshire Water
Stirling Cresent No1 Spsinto Holme Beck18 spills, 90 hours in 2025
1.5 km away - Yorkshire Water
Bower Grn/Chestnut St/Myrtle St/into East Brook (Culverted)60 spills, 71 hours in 2025
2.0 km away - Yorkshire Water
Cutler Heights Csointo Holme Beck (Culverted)18 spills, 34 hours in 2025
1.2 km away - Yorkshire Water
Shetcliffe Lane No 2 Csointo High Royds Beck21 spills, 28 hours in 2025
1.3 km away - Yorkshire Water
Mount Street No 2 Csointo East Brook (Culverted)18 spills, 22 hours in 2025
2.0 km away - Yorkshire Water
Mulgrave Street 259 Csointo East Brook (Culverted)13 spills, 18 hours in 2025
2.0 km away - Yorkshire Water
Bower Grn/Chestnut St/Myrtle St/into East Brook (Culverted)16 spills, 9 hours in 2025
2.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
57 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Bradford Forster Academy - Solar PanelsApproved, not yet built · 380 kW
Mar 2024
600 m away - Rooftop solar
Swaledale House, Weaverthorpe Road - Solar PanelsApproved, not yet built · 2 MW
Aug 2023
1.4 km away - Rooftop solar
Bow Beck Bowling, Back Lane - Solar PanelsApproved, not yet built · 180 kW
Jun 2023
1.6 km away - Biomass
Unit 1, Whitehead Business Park - Biomass BoilerApproved, not yet built · 200 kW
Jan 2024
1.7 km away - Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityPlanning application in
May 2024
1.8 km away - Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityApproved, not yet built
Nov 2024
1.8 km away - Rooftop solar
St Matthews CE Primary School, Ivy House Road - Solar PanelsPlanning application in · 180 kW
Jun 2026
1.9 km away - Rooftop solar
Trafalgar House Police Station - Installation Of Solar PV SystemBeing built
Sept 2023
2.3 km away - Rooftop solar
Roydsdale Way, Unit 6 - Solar PanelApproved, not yet built · 2 MW
Mar 2026
2.5 km away - Rooftop solar
Sedbergh Sports and Leisure Centre - Solar PV InstallationBeing built · 200 kW
Mar 2026
2.8 km away
Road and street works within 1 km
5 permitted works running now or planned.
- Standard
Belford Close, BradfordUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026
800 m away - Standard
Holsworthy Road, BradfordUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026
850 m away - Standard
Romsey Gardens, BradfordUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026
850 m away - Standard
Holme Wood Road, BradfordUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026
900 m away - Standard
Vulcan Street, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Nov 2026 to Nov 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
21.8 km away - Decideddecided Oct 2015
29.5 km away - Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M). application due February 2028
29.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 5.5 km); Esholt WWTW (other, 7.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.