Country England and Wales › Region Yorkshire and The Humber › Council Bradford › Neighbourhood Barkerend East › Postcode BD3 9EJ What's changing near BD3 9EJ Within 2 km, around Barkerend East in Bradford. Building, planning, schools, transport, prices and crime.
74 new homes completed within 2 km, last 2 years
7 homes given permission on brownfield sites since 2021
-0.3% like-for-like prices in Barkerend East, 2024 → 2025 (council +5.1%)
+4% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 9 new homes completed flats · Jun 2026
Jun 2026 1.9 km away School closed School closed: Training and Skills Centre Other independent special school, other independent special school (de-registered)
Jan 2026 900 m away New homes 16 new homes completed houses · Jan 2025 – Mar 2025
Mar 2025 1.7 km away New homes 7 new homes completed houses · Oct 2024 – Mar 2025
Mar 2025 2.0 km away New homes 25 new homes completed houses · Oct 2024 – Jan 2025
Jan 2025 1.8 km away School closed School closed: TLG Bradford Other independent school, other independent school (closure)
Nov 2022 1.3 km away School closed School closed: Olive Secondary Other independent school, other independent school (closure)
Jun 2022 350 m away Planning permission Jun 2022 1.8 km away School closed School closed: Olive Secondary Girls Other independent school, other independent school (closure)
Jul 2021 350 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
22 homes extended 2021–2025, typically adding 25 m²
425 since energy certificates began (2008)
9 in BD3 9EJ itself
Extended certificate 2026 Extended certificate 2016 Extended certificate 2016 Extended certificate 2016 Extended certificate 2015 Extended Storm overflows within 2 km 20 storm overflows within 2 km
773 hours of spills in 2025 between them (typical neighbourhood: about 36)
377 spill events counted
Yorkshire Water Bower Grn/Chestnut St/Myrtle St/ into East Brook (Culverted) 78 spills, 286 hours in 2025
950 m away Yorkshire Water Hammerton St/Leeds Rd/Harris St Cso into East Brook (Culverted) 24 spills, 163 hours in 2025
1.3 km away Yorkshire Water Bower Grn/Chestnut St/Myrtle St/ into East Brook (Culverted) 60 spills, 71 hours in 2025
950 m away Yorkshire Water Dick Lne Cso & New Lne Sps into Cul Trib Of Tyersal Beck 19 spills, 64 hours in 2025
1.7 km away Yorkshire Water North Brook Street No 1 Cso into Bradford Beck (Culverted) 39 spills, 45 hours in 2025
1.5 km away Yorkshire Water Vicar Lane 2 Cso into East Brook (Culverted) 33 spills, 30 hours in 2025
1.4 km away Yorkshire Water Manchester Road Cso into Bowling Beck 23 spills, 25 hours in 2025
2.0 km away Yorkshire Water Mount Street No 2 Cso into East Brook (Culverted) 18 spills, 22 hours in 2025
950 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 58 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Anaerobic digestion Cashmere Works, Birksland Street - Anaerobic Digestion Facility Planning application in
May 2024 750 m away Anaerobic digestion Cashmere Works, Birksland Street - Anaerobic Digestion Facility Approved, not yet built
Nov 2024 750 m away Rooftop solar Bow Beck Bowling, Back Lane - Solar Panels Approved, not yet built · 180 kW
Jun 2023 1.1 km away Biomass Unit 1, Whitehead Business Park - Biomass Boiler Approved, not yet built · 200 kW
Jan 2024 1.2 km away Rooftop solar Bradford Forster Academy - Solar Panels Approved, not yet built · 380 kW
Mar 2024 1.8 km away Rooftop solar Trafalgar House Police Station - Installation Of Solar PV System Being built
Sept 2023 1.9 km away Battery storage Midland Road - Battery Energy Storage Approved, not yet built · 80 MW
Dec 2024 2.0 km away Other Bradford Low Carbon Hydrogen Approved, not yet built
Apr 2024 2.1 km away Rooftop solar The University Of Bradford Stadium - Solar Panels Approved, not yet built · 200 kW
Feb 2024 2.2 km away Rooftop solar University of Bradford, Richmond Road - Solar Panels Approved, not yet built · 400 kW
Nov 2022 2.3 km away Road and street works within 1 km 16 permitted works running now or planned, 3 of them major.
Major Back Folkestone Street Nw, Bradford Remedial works · YORKSHIRE WATER · Road closure
Dec 2026 to Dec 2026 200 m away Major, planned Greenhill Lane, Bradford New service connection · YORKSHIRE WATER · Road closure
Nov 2026 to Nov 2026 700 m away Major Greenhill Lane, Bradford New service connection · YORKSHIRE WATER · Road closure
Nov 2026 to Nov 2026 700 m away Standard Warley Drive, Bradford Utility repair and maintenance works · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026 550 m away Standard First Avenue, Bradford Utility repair and maintenance works · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026 650 m away Standard Warley Drive, Bradford Utility repair and maintenance works · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026 650 m away Standard Killinghall Road, Bradford Highway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Stop/go boards
Nov 2026 to Nov 2026 750 m away Standard Third Avenue, Bradford Utility repair and maintenance works · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026 750 m away Standard Seymour Street, Bradford Utility asset works · HUTCHISON 3G LTD · Multi-way signals
Oct 2026 to Oct 2026 750 m away Major infrastructure projects within 30 km Pre-application Calderdale Energy Park Generating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026 21.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Running nearest: Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 3.1 km); Esholt WWTW (other, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.