53 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Battery storage
Midland Road - Battery Energy StorageApproved, not yet built · 80 MW
Dec 2024 750 m away
Rooftop solar
The University Of Bradford Stadium - Solar PanelsApproved, not yet built · 200 kW
Feb 2024 900 m away
Rooftop solar
University of Bradford, Richmond Road - Solar PanelsApproved, not yet built · 400 kW
Nov 2022 1.7 km away
Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityPlanning application in
May 2024 1.7 km away
Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityApproved, not yet built
Nov 2024 1.7 km away
Rooftop solar
Trafalgar House Police Station - Installation Of Solar PV SystemBeing built
Sept 2023 1.7 km away
Rooftop solar
Bow Beck Bowling, Back Lane - Solar PanelsApproved, not yet built · 180 kW
Jun 2023 1.7 km away
Other
Bradford Low Carbon HydrogenApproved, not yet built
Apr 2024 2.1 km away
Biomass
Unit 1, Whitehead Business Park - Biomass BoilerApproved, not yet built · 200 kW
Jan 2024 2.5 km away
Rooftop solar
Bradford Forster Academy - Solar PanelsApproved, not yet built · 380 kW
Mar 2024 2.8 km away
Road and street works within 1 km
6 permitted works running now or planned, 4 of them major.
Major, planned
North Street, BradfordHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Dec 2026 to Dec 2026 650 m away
Major, planned
Cross Wellington Street, BradfordHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Dec 2026 to Dec 2026 700 m away
Major, planned
Wellington Street, BradfordHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Dec 2026 to Dec 2026 700 m away
Major, planned
Queens Road, BradfordHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Jan 2027 to Mar 2027 950 m away
Standard
North Brook Street, BradfordUtility asset works · ESP ELECTRICITY · Priority working
Oct 2026 to Oct 2026 500 m away
Standard
Valley Road, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Nov 2026 to Nov 2026 650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 20.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Undercliffe: +52% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.7% in two years.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Rooftop solar
Morrisons, Thornton Road - Solar PV PanelsApproved, not yet built · 900 kW
Mar 2022 2.8 km away
Battery storage
Stor Generation Plant - Battery StorageApproved, not yet built · 12 MW