What's changing near BD2 4DU
Within 2 km, around Bolton Road & Kings Road in Bradford. Building, planning, schools, transport, prices and crime.
219new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+10.4%like-for-like prices in Bolton Road & Kings Road, 2024 → 2025 (council +5.1%)
-11%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completedhouses · Apr 2026 – Jun 2026
Jun 2026
1.8 km away - New homes
26 new homes completed18 flats, 8 houses · Feb 2026
Feb 2026
1.2 km away - New homes
22 new homes completedhouses · Sep 2025 – Feb 2026
Feb 2026
1.8 km away - New homes
13 new homes completedhouses · Apr 2025 – Oct 2025
Oct 2025
1.9 km away - New homes
51 new homes completedflats · Jul 2025
Jul 2025
1.5 km away - New homes
6 new homes completedhouses · Oct 2024 – Jul 2025
Jul 2025
1.7 km away - New homes
17 new homes completedhouses · Oct 2024 – Jun 2025
Jun 2025
1.9 km away - New homes
14 new homes completedhouses · Nov 2024 – Apr 2025
Apr 2025
2.0 km away - New homes
16 new homes completedhouses · Jan 2025 – Mar 2025
Mar 2025
1.6 km away - New homes
25 new homes completedhouses · Oct 2024 – Jan 2025
Jan 2025
1.7 km away - School closed
School closed: J.A.M.E.SOther independent special school, other independent special school (closure)
Jul 2023
1.8 km away - New school
New school: Hanson AcademyAcademy sponsor led, secondary
19homes extended 2021–2025, typically adding 30 m²
61since energy certificates began (2008)
4in BD2 4DU itself
- Extendedcertificate 2026
- Extendedcertificate 2016
- Extendedcertificate 2015
- Extendedcertificate 2014
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
15storm overflows within 2 km
1,086hours of spills in 2025 between them (typical neighbourhood: about 36)
291spill events counted
- Yorkshire Water
Canal Road Frizinghall Csointo Bradford Beck100 spills, 618 hours in 2025
1.4 km away - Yorkshire Water
North Avenue Csointo Bradford Beck25 spills, 239 hours in 2025
1.2 km away - Yorkshire Water
Yorkshire Water Frizley Gardens Brainto Bradford Beck36 spills, 97 hours in 2025
1.7 km away - Yorkshire Water
Ashbourne Road Csointo Bolton Beck28 spills, 46 hours in 2025
400 m away - Yorkshire Water
North Brook Street No 1 Csointo Bradford Beck (Culverted)39 spills, 45 hours in 2025
1.9 km away - Yorkshire Water
Cross Sun Street Csointo Bradford Beck (Culverted)17 spills, 12 hours in 2025
1.9 km away - Yorkshire Water
Powell Road Csointo Trap Sike13 spills, 9 hours in 2025
1.4 km away - Yorkshire Water
Valley Road Shipley 2 Csointo Bradford Beck13 spills, 6 hours in 2025
2.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
45 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
- Other
Bradford Low Carbon HydrogenApproved, not yet built
Apr 2024
1.4 km away - Rooftop solar
The University Of Bradford Stadium - Solar PanelsApproved, not yet built · 200 kW
Feb 2024
1.6 km away - Battery storage
Midland Road - Battery Energy StorageApproved, not yet built · 80 MW
Dec 2024
1.6 km away - Rooftop solar
Sainsburys - Solar PanelsApproved, not yet built · 310 kW
Sept 2024
2.6 km away - Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityPlanning application in
May 2024
2.8 km away - Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityApproved, not yet built
Nov 2024
2.8 km away - Rooftop solar
University of Bradford, Richmond Road - Solar PanelsApproved, not yet built · 400 kW
Nov 2022
2.9 km away - Rooftop solar
Bow Beck Bowling, Back Lane - Solar PanelsApproved, not yet built · 180 kW
Jun 2023
3.0 km away - Rooftop solar
Trafalgar House Police Station - Installation Of Solar PV SystemBeing built
Sept 2023
3.1 km away - Rooftop solar
Marston House, Otley Road - Solar PanelsApproved, not yet built · 3 MW
May 2023
3.4 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
- Major, planned
Queens Road, BradfordHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Jan 2027 to Mar 2027
900 m away - Standard
Brisbane Avenue, BradfordDisconnection or alteration of supply · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026
450 m away - Standard
Clara Road, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Dec 2026 to Dec 2026
1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
20.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 1.3 km); Esholt WWTW (other, 4.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.