Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
234hours of spills in 2025 between them (typical neighbourhood: about 36)
100spill events counted
Yorkshire Water
Roundwood Glen No 2 Csointo Carr Beck54 spills, 161 hours in 2025
1.6 km away
Yorkshire Water
Ravenscliffe Avenue Csointo Fagley Beck12 spills, 37 hours in 2025
350 m away
Yorkshire Water
Beck Bottom Csointo Carr Beck16 spills, 27 hours in 2025
1.5 km away
Yorkshire Water
Woodhall Road No 2 Csointo Fagley Beck18 spills, 9 hours in 2025
56 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Other
Bradford Low Carbon HydrogenApproved, not yet built
Apr 2024 550 m away
Rooftop solar
Sainsburys - Solar PanelsApproved, not yet built · 310 kW
Sept 2024 1.6 km away
Biomass
Unit 1, Whitehead Business Park - Biomass BoilerApproved, not yet built · 200 kW
Jan 2024 2.8 km away
Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityPlanning application in
May 2024 2.9 km away
Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityApproved, not yet built
Nov 2024 2.9 km away
Battery storage
Midland Road - Battery Energy StorageApproved, not yet built · 80 MW
Dec 2024 3.1 km away
Rooftop solar
The University Of Bradford Stadium - Solar PanelsApproved, not yet built · 200 kW
Feb 2024 3.2 km away
Rooftop solar
Spring Valley Mills - Solar PanelsApproved, not yet built · 380 kW
Apr 2022 3.3 km away
Rooftop solar
Bow Beck Bowling, Back Lane - Solar PanelsApproved, not yet built · 180 kW
Jun 2023 3.3 km away
Rooftop solar
West Specialist Inclusive Learning Centre, Town Street - Solar PV PanelsApproved, not yet built · 240 kW
Jun 2024 3.7 km away
Road and street works within 1 km
1 permitted works running now or planned.
Standard
Harrogate Road, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · No carriageway incursion
Oct 2026 to Oct 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Ravenscliffe: +40% over five years (2020 → 2025).
Council tax list: 150 homes added in the neighbourhood since April 2024.
Population (GP registrations): +6.1% in two years.