Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
110hours of spills in 2025 between them (typical neighbourhood: about 36)
49spill events counted
Yorkshire Water
Dick Lne Cso & New Lne Spsinto Cul Trib Of Tyersal Beck19 spills, 64 hours in 2025
1.7 km away
Yorkshire Water
Ravenscliffe Avenue Csointo Fagley Beck12 spills, 37 hours in 2025
750 m away
Yorkshire Water
Woodhall Road No 2 Csointo Fagley Beck18 spills, 9 hours in 2025
58 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Other
Bradford Low Carbon HydrogenApproved, not yet built
Apr 2024 900 m away
Biomass
Unit 1, Whitehead Business Park - Biomass BoilerApproved, not yet built · 200 kW
Jan 2024 2.1 km away
Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityPlanning application in
May 2024 2.2 km away
Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityApproved, not yet built
Nov 2024 2.2 km away
Rooftop solar
Sainsburys - Solar PanelsApproved, not yet built · 310 kW
Sept 2024 2.3 km away
Rooftop solar
Bow Beck Bowling, Back Lane - Solar PanelsApproved, not yet built · 180 kW
Jun 2023 2.7 km away
Battery storage
Midland Road - Battery Energy StorageApproved, not yet built · 80 MW
Dec 2024 2.8 km away
Rooftop solar
The University Of Bradford Stadium - Solar PanelsApproved, not yet built · 200 kW
Feb 2024 2.9 km away
Rooftop solar
Bradford Forster Academy - Solar PanelsApproved, not yet built · 380 kW
Mar 2024 3.2 km away
Rooftop solar
Spring Valley Mills - Solar PanelsApproved, not yet built · 380 kW
Apr 2022 3.3 km away
Rooftop solar
Road and street works within 1 km
17 permitted works running now or planned, 1 of them major.
Major
Woodhall Avenue, BradfordUtility asset works · YORKSHIRE WATER · Road closure
Sept 2026 to Oct 2026 850 m away
Standard
Hodgson Avenue, BradfordUtility repair and maintenance works · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026 650 m away
Standard
Baring Avenue, BradfordUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026 700 m away
Standard
Silverhill Drive, BradfordUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026 700 m away
Standard
Fifth Avenue, BradfordUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away
Standard
Gain Lane, BradfordUtility asset works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026 800 m away
Standard
Third Avenue, BradfordUtility repair and maintenance works · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026 800 m away
Standard
Killinghall Road, BradfordHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Stop/go boards
Nov 2026 to Nov 2026 850 m away
Standard
Killinghall Drive, BradfordUtility repair and maintenance works · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026 850 m away
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
application due February 2028 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Ravenscliffe: +40% over five years (2020 → 2025).
Council tax list: 150 homes added in the neighbourhood since April 2024.
Population (GP registrations): +6.1% in two years.