What's changing near BD2 3HS
Within 2 km, around Haigh Fold in Bradford. Building, planning, schools, transport, prices and crime.
133new homes completed within 2 km, last 2 years
7homes given permission on brownfield sites since 2021
+9.0%like-for-like prices in Haigh Fold, 2024 → 2025 (council +5.1%)
+2%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completedhouses · Apr 2026 – Jun 2026
Jun 2026
700 m away - New homes
22 new homes completedhouses · Sep 2025 – Feb 2026
Feb 2026
700 m away - New homes
13 new homes completedhouses · Apr 2025 – Oct 2025
Oct 2025
750 m away - New homes
17 new homes completedhouses · Oct 2024 – Jun 2025
Jun 2025
700 m away - New homes
14 new homes completedhouses · Nov 2024 – Apr 2025
Apr 2025
750 m away - New homes
16 new homes completedhouses · Jan 2025 – Mar 2025
Mar 2025
300 m away - New homes
25 new homes completedhouses · Oct 2024 – Jan 2025
Jan 2025
350 m away - New school
New school: Hanson AcademyAcademy sponsor led, secondary
Jul 2022
1.8 km away - School closed
School closed: Olive SecondaryOther independent school, other independent school (closure)
Jun 2022
1.4 km away - Planning permissionJun 2022
1.5 km away - School closed
School closed: Olive Secondary GirlsOther independent school, other independent school (closure)
23homes extended 2021–2025, typically adding 28 m²
83since energy certificates began (2008)
4in BD2 3HS itself
- Extendedcertificate 2024
- Extendedcertificate 2015
- Extendedcertificate 2012
- Extendedcertificate 2011
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
98hours of spills in 2025 between them (typical neighbourhood: about 36)
63spill events counted
- Yorkshire Water
Ashbourne Road Csointo Bolton Beck28 spills, 46 hours in 2025
1.7 km away - Yorkshire Water
Ravenscliffe Avenue Csointo Fagley Beck12 spills, 37 hours in 2025
1.0 km away - Yorkshire Water
Woodhall Road No 2 Csointo Fagley Beck18 spills, 9 hours in 2025
900 m away - Yorkshire Water
Queens Road Bradford Csointo Bolton Beck5 spills, 6 hours in 2025
2.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
57 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
- Other
Bradford Low Carbon HydrogenApproved, not yet built
Apr 2024
650 m away - Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityPlanning application in
May 2024
2.2 km away - Anaerobic digestion
Cashmere Works, Birksland Street - Anaerobic Digestion FacilityApproved, not yet built
Nov 2024
2.2 km away - Rooftop solar
Sainsburys - Solar PanelsApproved, not yet built · 310 kW
Sept 2024
2.3 km away - Biomass
Unit 1, Whitehead Business Park - Biomass BoilerApproved, not yet built · 200 kW
Jan 2024
2.3 km away - Battery storage
Midland Road - Battery Energy StorageApproved, not yet built · 80 MW
Dec 2024
2.4 km away - Rooftop solar
The University Of Bradford Stadium - Solar PanelsApproved, not yet built · 200 kW
Feb 2024
2.5 km away - Rooftop solar
Bow Beck Bowling, Back Lane - Solar PanelsApproved, not yet built · 180 kW
Jun 2023
2.6 km away - Rooftop solar
Trafalgar House Police Station - Installation Of Solar PV SystemBeing built
Sept 2023
3.1 km away - Rooftop solar
Bradford Forster Academy - Solar PanelsApproved, not yet built · 380 kW
Mar 2024
3.3 km away - Rooftop solar
Road and street works within 1 km
11 permitted works running now or planned.
- Standard
Harrogate Road, BradfordNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · No carriageway incursion
Oct 2026 to Oct 2026
400 m away - Standard
Killinghall Drive, BradfordUtility repair and maintenance works · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026
550 m away - Standard
Fifth Avenue, BradfordUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026
600 m away - Standard
Killinghall Road, BradfordHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Stop/go boards
Nov 2026 to Nov 2026
750 m away - Standard
Third Avenue, BradfordUtility repair and maintenance works · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026
750 m away - Standard
First Avenue, BradfordUtility repair and maintenance works · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026
850 m away - Standard
Silverhill Drive, BradfordUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026
850 m away - Standard
Baring Avenue, BradfordUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026
900 m away - Standard
Hodgson Avenue, BradfordUtility repair and maintenance works · VIRGIN MEDIA · No carriageway incursion
Oct 2026 to Oct 2026950 m away
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
21.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 1.8 km); Esholt WWTW (other, 4.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.