What's changing near BD21 4AX
Within 2 km, around Keighley Central & East in Bradford. Building, planning, schools, transport, prices and crime.
111new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-2.5%like-for-like prices in Keighley Central & East, 2024 → 2025 (council +5.1%)
-16%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
13 new homes completedhouses · Nov 2025 – Oct 2026
planned Oct 2026
1.3 km away - New homes
6 new homes completedhouses · Jun 2026 – Oct 2026
planned Oct 2026
1.3 km away - New homes
28 new homes completedhouses · Nov 2024 – Oct 2026
Oct 2026
2.0 km away - New homes
12 new homes completedflats · Sep 2025 – Apr 2026
Apr 2026
1.2 km away - New homes
31 new homes completedhouses · Apr 2025 – Jan 2026
Jan 2026
2.0 km away - New homes
7 new homes completedhouses · Mar 2025
Mar 2025
1.3 km away - New schoolAug 2022
1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
9homes extended 2021–2025, typically adding 22 m²
83since energy certificates began (2008)
6in BD21 4AX itself
- Extendedcertificate 2016
- Extendedcertificate 2016
- Extendedcertificate 2016
- Extendedcertificate 2015
- Extendedcertificate 2015
- Extended
Storm overflows within 2 km
23storm overflows within 2 km
2,207hours of spills in 2025 between them (typical neighbourhood: about 36)
484spill events counted
- Yorkshire Water
Keighley (Marley) Stwinto River Aire77 spills, 1,078 hours in 2025
1.8 km away - Yorkshire Water
Keighley (Marley) Stwinto River Aire69 spills, 380 hours in 2025
1.8 km away - Yorkshire Water
Keighley (Marley) Stwinto River Aire37 spills, 174 hours in 2025
1.8 km away - Yorkshire Water
Worth Way North Beck Csointo River Worth34 spills, 138 hours in 2025
1.3 km away - Yorkshire Water
Spring Avenue Csointo River Worth (Via Public Sewer)45 spills, 98 hours in 2025
750 m away - Yorkshire Water
Cemetery Lane Csointo River Aire29 spills, 94 hours in 2025
1.5 km away - Yorkshire Water
Bradford Road 5 Csointo Tributary Of The River Aire42 spills, 62 hours in 2025
1.0 km away - Yorkshire Water
Grange Road 7 Csointo River Aire27 spills, 51 hours in 2025
500 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
20 planned, approved or being built and 0 running. Those within 5 km are on the map above.
- Rooftop solar
Riverside Business Park, Ings Avenue - Solar PV SystemApproved, not yet built · 160 kW
Jun 2025
550 m away - Battery storage
Dalton LaneApproved, not yet built
Oct 2020
650 m away - Rooftop solar
Sainsburys Centre, Cavendish Street - Solar PanelsApproved, not yet built · 720 kW
May 2026
850 m away - Rooftop solar
Universal Av Services, Horizon House - Solar PanelsApproved, not yet built · 180 kW
Oct 2022
1.3 km away - Rooftop solar
Carlton Keighley, Green Head Road - Solar ArrayApproved, not yet built · 540 kW
Nov 2024
1.4 km away - Rooftop solar
University Academy Keighley, Green Head Road - Solar PanelsApproved, not yet built · 510 kW
Apr 2025
1.4 km away - Rooftop solar
James Walker Moorflex - Solar PanelsApproved, not yet built
Aug 2022
5.2 km away - Battery storage
Lane Side - Energy StorageApproved, not yet built · 100 MW
Jul 2025
6.5 km away - Rooftop solar
South Craven School, Holme Lane, Cross Hills - Solar panelsApproved, not yet built · 630 kW
Oct 2024
6.8 km away - Battery storage
Bradford West, Harrop Lane, Wilsden - Battery StorageApproved, not yet built · 100 MW
May 2023
7.3 km away - Battery storage
Road and street works within 1 km
11 permitted works running now or planned, 4 of them major.
- Major
Parkwood Street, KeighleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Two-way signals
Oct 2026 to Nov 2026
700 m away - Major, planned
Granby Drive, KeighleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026
900 m away - Major
Granby Drive, KeighleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
900 m away - Major, planned
Cavendish Street, KeighleyHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Jan 2027 to Oct 2027
950 m away - Standard
Aireworth Road, KeighleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Two-way signals
Oct 2026 to Nov 2026
350 m away - Standard
Dalton Road, KeighleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Oct 2026
450 m away - Standard
Riverside, KeighleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Oct 2026
500 m away - Standard
Middle Way, KeighleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Oct 2026
500 m away - Standard
Strong Close Road, KeighleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
13.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.