What's changing near BD21 3LH
Within 2 km, around Keighley Central & East in Bradford. Building, planning, schools, transport, prices and crime.
141new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-2.5%like-for-like prices in Keighley Central & East, 2024 → 2025 (council +5.1%)
-16%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
28 new homes completedhouses · Nov 2024 – Oct 2026
Oct 2026
1.4 km away - New homes
5 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026
1.3 km away - New homes
12 new homes completedhouses · Nov 2025 – Jul 2026
Jul 2026
1.3 km away - New homes
12 new homes completedhouses · Dec 2025 – May 2026
May 2026
1.4 km away - New homes
12 new homes completedflats · Sep 2025 – Apr 2026
Apr 2026
800 m away - New homes
31 new homes completedhouses · Apr 2025 – Jan 2026
Jan 2026
1.4 km away - New homes
17 new homes completedhouses · Oct 2024 – May 2025
May 2025
1.5 km away - New homes
7 new homes completedhouses · Mar 2025
Mar 2025
700 m away - New schoolAug 2022
850 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
11homes extended 2021–2025, typically adding 34 m²
137since energy certificates began (2008)
1in BD21 3LH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
20storm overflows within 2 km
573hours of spills in 2025 between them (typical neighbourhood: about 36)
299spill events counted
- Yorkshire Water
Worth Way North Beck Csointo River Worth34 spills, 138 hours in 2025
1.2 km away - Yorkshire Water
Spring Avenue Csointo River Worth (Via Public Sewer)45 spills, 98 hours in 2025
900 m away - Yorkshire Water
Cemetery Lane Csointo River Aire29 spills, 94 hours in 2025
1.2 km away - Yorkshire Water
Bradford Road 5 Csointo Tributary Of The River Aire42 spills, 62 hours in 2025
1.6 km away - Yorkshire Water
Grange Road 7 Csointo River Aire27 spills, 51 hours in 2025
1.0 km away - Yorkshire Water
King George Csointo River Aire20 spills, 38 hours in 2025
1.5 km away - Yorkshire Water
Brandy Mill 34 Csointo River Worth19 spills, 38 hours in 2025
1.7 km away - Yorkshire Water
Worth Way Sun Street Csointo River Worth26 spills, 23 hours in 2025
1.3 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
17 planned, approved or being built and 2 running (3 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Riverside Business Park, Ings Avenue - Solar PV SystemApproved, not yet built · 160 kW
Jun 2025
550 m away - Rooftop solar
Sainsburys Centre, Cavendish Street - Solar PanelsApproved, not yet built · 720 kW
May 2026
550 m away - Rooftop solar
Carlton Keighley, Green Head Road - Solar ArrayApproved, not yet built · 540 kW
Nov 2024
850 m away - Rooftop solar
University Academy Keighley, Green Head Road - Solar PanelsApproved, not yet built · 510 kW
Apr 2025
850 m away - Rooftop solar
Universal Av Services, Horizon House - Solar PanelsApproved, not yet built · 180 kW
Oct 2022
1.1 km away - Battery storage
Dalton LaneApproved, not yet built
Oct 2020
1.2 km away - Rooftop solar
James Walker Moorflex - Solar PanelsApproved, not yet built
Aug 2022
5.8 km away - Rooftop solar
South Craven School, Holme Lane, Cross Hills - Solar panelsApproved, not yet built · 630 kW
Oct 2024
6.3 km away - Battery storage
Lane Side - Energy StorageApproved, not yet built · 100 MW
Jul 2025
6.8 km away - Battery storage
Bradford West, Harrop Lane, Wilsden - Battery StorageApproved, not yet built · 100 MW
May 2023
7.6 km away
Road and street works within 1 km
13 permitted works running now or planned, 4 of them major.
- Major, planned
Skipton Road, KeighleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Apr 2027 to Jun 2027
600 m away - Major
Skipton Road, KeighleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Apr 2027 to Jun 2027
600 m away - Major, planned
Cavendish Street, KeighleyHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Jan 2027 to Oct 2027
650 m away - Major
Devonshire Street, KeighleyUtility repair and maintenance works · BT · Road closure
Nov 2026 to Dec 2026
800 m away - Standard
Spencer Street, KeighleyUtility asset works · BT · Multi-way signals
Oct 2026 to Oct 2026
800 m away - Standard
Highfield Street, KeighleyUtility asset works · BT · Multi-way signals
Oct 2026 to Oct 2026
800 m away - Standard
Dalton Road, KeighleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Oct 2026
900 m away - Standard
Riverside, KeighleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Oct 2026
900 m away - Standard
Strong Close Road, KeighleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Oct 2026900 m away
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
12.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Chelker Reservoir (Retention of Turbines) (wind farm, 9.9 km); Chelker Reservoir (wind farm, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.