Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
19storm overflows within 2 km
397hours of spills in 2025 between them (typical neighbourhood: about 36)
208spill events counted
Yorkshire Water
Worth Way North Beck Csointo River Worth34 spills, 138 hours in 2025
1000 m away
Yorkshire Water
Spring Avenue Csointo River Worth (Via Public Sewer)45 spills, 98 hours in 2025
1.5 km away
Yorkshire Water
Brandy Mill 34 Csointo River Worth19 spills, 38 hours in 2025
1.2 km away
Yorkshire Water
Ingrow Bridge Csointo River Worth17 spills, 37 hours in 2025
1.5 km away
Yorkshire Water
Worth Way Sun Street Csointo River Worth26 spills, 23 hours in 2025
1.0 km away
Yorkshire Water
South Street Keighley Csointo River Worth Via Knowle Pk Spng25 spills, 22 hours in 2025
1.1 km away
Yorkshire Water
Ingrow Lane Csointo River Worth4 spills, 13 hours in 2025
1.5 km away
Yorkshire Water
Oakworth Csointo River Worth5 spills, 10 hours in 2025
17 planned, approved or being built and 1 running (18 MW between them). Those within 5 km are on the map above.
Rooftop solar
Universal Av Services, Horizon House - Solar PanelsApproved, not yet built · 180 kW
Oct 2022 950 m away
Rooftop solar
Sainsburys Centre, Cavendish Street - Solar PanelsApproved, not yet built · 720 kW
May 2026 1.0 km away
Rooftop solar
Carlton Keighley, Green Head Road - Solar ArrayApproved, not yet built · 540 kW
Nov 2024 1.3 km away
Rooftop solar
University Academy Keighley, Green Head Road - Solar PanelsApproved, not yet built · 510 kW
Apr 2025 1.3 km away
Rooftop solar
Riverside Business Park, Ings Avenue - Solar PV SystemApproved, not yet built · 160 kW
Jun 2025 1.8 km away
Battery storage
Dalton LaneApproved, not yet built
Oct 2020 2.1 km away
Rooftop solar
South Craven School, Holme Lane, Cross Hills - Solar panelsApproved, not yet built · 630 kW
Oct 2024 5.8 km away
Rooftop solar
James Walker Moorflex - Solar PanelsApproved, not yet built
Aug 2022 6.3 km away
Battery storage
Lane Side - Energy StorageApproved, not yet built · 100 MW
Jul 2025 6.6 km away
Battery storage
Bradford West, Harrop Lane, Wilsden - Battery StorageApproved, not yet built · 100 MW
May 2023 7.4 km away
Road and street works within 1 km
12 permitted works running now or planned, 3 of them major.
Major
Devonshire Street, KeighleyUtility repair and maintenance works · BT · Road closure
Nov 2026 to Dec 2026 650 m away
Major, planned
Cavendish Street, KeighleyHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Jan 2027 to Oct 2027 900 m away
Major
Nessfield Drive, KeighleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Jul 2026 to Oct 2026 1000 m away
Standard
Aireworth Street, KeighleyUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026 500 m away
Standard
Highfield Street, KeighleyUtility asset works · BT · Multi-way signals
Oct 2026 to Oct 2026 550 m away
Standard
Spencer Street, KeighleyUtility asset works · BT · Multi-way signals
Oct 2026 to Oct 2026 550 m away
Standard
Kensington Street, KeighleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Oct 2026 700 m away
Standard
Oakworth Road, KeighleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Nov 2026 to Nov 2026 700 m away
Standard
Braithwaite Grove, KeighleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Feb 2027 to Feb 2027 750 m away
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 11.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Keighley Oakworth Road & West Lane: +29% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.0% in two years.