What's changing near BD20 7QU
Within 2 km, around Sutton & Crosshills in North Yorkshire. Building, planning, schools, transport, prices and crime.
21new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-0.5%like-for-like prices in Sutton & Crosshills, 2024 → 2025 (council +2.2%)
+7%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
15homes extended 2021–2025, typically adding 22 m²
26since energy certificates began (2008)
1in BD20 7QU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
483hours of spills in 2025 between them (typical neighbourhood: about 36)
191spill events counted
- Yorkshire Water
Eastburn Old Stw Csointo Mill Stream59 spills, 221 hours in 2025
1.6 km away - Yorkshire Water
Hardings Lane Csointo Clvrt Tributary Of River Aire34 spills, 83 hours in 2025
1.4 km away - Yorkshire Water
Sutton Main Street Csointo Holme/Eastburn Beck25 spills, 48 hours in 2025
950 m away - Yorkshire Water
St. Andrews Terrace Spsinto Soakaway43 spills, 44 hours in 2025
1.3 km away - Yorkshire Water
Eastburn Csointo River Aire7 spills, 34 hours in 2025
1.9 km away - Yorkshire Water
Kildwick Spsinto River Aire8 spills, 33 hours in 2025
1.7 km away - Yorkshire Water
Lyon Road No 2 Csointo Mill Stream Trib Eastburn Beck7 spills, 16 hours in 2025
1.5 km away - Yorkshire Water
Cross Hills Csointo Tributary Of Holme Beck8 spills, 6 hours in 2025
500 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
10 planned, approved or being built and 3 running (5 MW between them). Those within 5 km are on the map above.
- Rooftop solar
South Craven School, Holme Lane, Cross Hills - Solar panelsApproved, not yet built · 630 kW
Oct 2024
700 m away - Rooftop solar
Tow Top Farm, Babyhouse Lane - Solar PanelsPlanning application in · 150 kW
Jun 2026
4.6 km away - Rooftop solar
Carlton Keighley, Green Head Road - Solar ArrayApproved, not yet built · 540 kW
Nov 2024
5.5 km away - Rooftop solar
University Academy Keighley, Green Head Road - Solar PanelsApproved, not yet built · 510 kW
Apr 2025
5.5 km away - Rooftop solar
Dechra Pharmaceuticals Manufacturing, Building 3 - Solar PanelsApproved, not yet built · 2 MW
Sept 2022
6.2 km away - Rooftop solar
Sainsburys Centre, Cavendish Street - Solar PanelsApproved, not yet built · 720 kW
May 2026
6.4 km away - Rooftop solar
Riverside Business Park, Ings Avenue - Solar PV SystemApproved, not yet built · 160 kW
Jun 2025
6.5 km away - Rooftop solar
Universal Av Services, Horizon House - Solar PanelsApproved, not yet built · 180 kW
Oct 2022
6.6 km away - Biomass
Warley Wise Lane - Biomass BoilerApproved, not yet built · 300 kW
Nov 2022
7.2 km away - Battery storage
Dalton LaneApproved, not yet built
Oct 2020
7.4 km away
Running nearest: Skibeden (landfill gas, 8.5 km); Chelker Reservoir (Retention of Turbines) (wind farm, 9.2 km); Chelker Reservoir (wind farm, 9.2 km).
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
10.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.