Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
572hours of spills in 2025 between them (typical neighbourhood: about 36)
203spill events counted
Yorkshire Water
Eastburn Old Stw Csointo Mill Stream59 spills, 221 hours in 2025
1.6 km away
Yorkshire Water
Keighley Road 76 Csointo River Aire54 spills, 170 hours in 2025
1.2 km away
Yorkshire Water
Steeton Csointo Steeton Beck51 spills, 85 hours in 2025
1.0 km away
Yorkshire Water
Sutton Main Street Csointo Holme/Eastburn Beck25 spills, 48 hours in 2025
1.8 km away
Yorkshire Water
Eastburn Csointo River Aire7 spills, 34 hours in 2025
1.6 km away
Yorkshire Water
Lyon Road No 2 Csointo Mill Stream Trib Eastburn Beck7 spills, 16 hours in 2025
13 planned, approved or being built and 3 running (5 MW between them). Those within 5 km are on the map above.
Rooftop solar
South Craven School, Holme Lane, Cross Hills - Solar panelsApproved, not yet built · 630 kW
Oct 2024 2.5 km away
Rooftop solar
Carlton Keighley, Green Head Road - Solar ArrayApproved, not yet built · 540 kW
Nov 2024 3.0 km away
Rooftop solar
University Academy Keighley, Green Head Road - Solar PanelsApproved, not yet built · 510 kW
Apr 2025 3.0 km away
Rooftop solar
Riverside Business Park, Ings Avenue - Solar PV SystemApproved, not yet built · 160 kW
Jun 2025 3.9 km away
Rooftop solar
Sainsburys Centre, Cavendish Street - Solar PanelsApproved, not yet built · 720 kW
May 2026 4.1 km away
Rooftop solar
Universal Av Services, Horizon House - Solar PanelsApproved, not yet built · 180 kW
Oct 2022 4.4 km away
Battery storage
Dalton LaneApproved, not yet built
Oct 2020 5.0 km away
Rooftop solar
Tow Top Farm, Babyhouse Lane - Solar PanelsPlanning application in · 150 kW
Jun 2026 7.1 km away
Rooftop solar
Dechra Pharmaceuticals Manufacturing, Building 3 - Solar PanelsApproved, not yet built · 2 MW
Sept 2022 7.5 km away
Rooftop solar
James Walker Moorflex - Solar PanelsApproved, not yet built
Aug 2022 9.6 km away
Road and street works within 1 km
4 permitted works running now or planned.
Standard
Barrows Lane, Steeton With EastburnHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Oct 2026 300 m away
Minor
Parkway, Steeton With EastburnHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Give and take
Oct 2026 to Oct 2026 550 m away
Minor
Summerhill Lane, Steeton With EastburnHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Give and take
Oct 2026 to Oct 2026 650 m away
Minor
Heron Close, Steeton With EastburnHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Give and take
Oct 2026 to Oct 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 12.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Steeton & Silsden Rural: +26% over five years (2020 → 2025).
Council tax list: 80 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.4% in two years.