Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
15storm overflows within 2 km
1,980hours of spills in 2025 between them (typical neighbourhood: about 36)
358spill events counted
Yorkshire Water
Keighley (Marley) Stwinto River Aire77 spills, 1,078 hours in 2025
1.8 km away
Yorkshire Water
Keighley (Marley) Stwinto River Aire69 spills, 380 hours in 2025
1.8 km away
Yorkshire Water
Keighley (Marley) Stwinto River Aire37 spills, 174 hours in 2025
1.8 km away
Yorkshire Water
Spring Avenue Csointo River Worth (Via Public Sewer)45 spills, 98 hours in 2025
1.5 km away
Yorkshire Water
Cemetery Lane Csointo River Aire29 spills, 94 hours in 2025
1.3 km away
Yorkshire Water
Bradford Road 5 Csointo Tributary Of The River Aire42 spills, 62 hours in 2025
850 m away
Yorkshire Water
Grange Road 7 Csointo River Aire27 spills, 51 hours in 2025
350 m away
Yorkshire Water
King George Csointo River Aire20 spills, 38 hours in 2025
19 planned, approved or being built and 2 running (3 MW between them). Those within 5 km are on the map above.
Rooftop solar
Riverside Business Park, Ings Avenue - Solar PV SystemApproved, not yet built · 160 kW
Jun 2025 550 m away
Battery storage
Dalton LaneApproved, not yet built
Oct 2020 1.1 km away
Rooftop solar
Sainsburys Centre, Cavendish Street - Solar PanelsApproved, not yet built · 720 kW
May 2026 1.5 km away
Rooftop solar
Carlton Keighley, Green Head Road - Solar ArrayApproved, not yet built · 540 kW
Nov 2024 1.6 km away
Rooftop solar
University Academy Keighley, Green Head Road - Solar PanelsApproved, not yet built · 510 kW
Apr 2025 1.6 km away
Rooftop solar
Universal Av Services, Horizon House - Solar PanelsApproved, not yet built · 180 kW
Oct 2022 2.0 km away
Rooftop solar
James Walker Moorflex - Solar PanelsApproved, not yet built
Aug 2022 5.5 km away
Rooftop solar
South Craven School, Holme Lane, Cross Hills - Solar panelsApproved, not yet built · 630 kW
Oct 2024 6.8 km away
Battery storage
Lane Side - Energy StorageApproved, not yet built · 100 MW
Jul 2025 7.1 km away
Rooftop solar
Moorland Engineering Works, Lower Railway Road - Solar PanelsApproved, not yet built · 280 kW
Jun 2025 7.2 km away
Road and street works within 1 km
6 permitted works running now or planned, 3 of them major.
Major, planned
Granby Drive, KeighleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026 500 m away
Major
Granby Drive, KeighleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 500 m away
Major, planned
Hospital Road, KeighleyUtility repair and maintenance works · BT · Road closure
Nov 2026 to Nov 2026 1000 m away
Standard
Banks Lane, KeighleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Nov 2026 to Nov 2026 350 m away
Standard
Bradford Road, KeighleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Oct 2026 to Oct 2026 400 m away
Standard
Aireworth Road, KeighleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Two-way signals
Oct 2026 to Nov 2026 700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 13.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Riddlesden & East Morton: +35% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.6% in two years.