What's changing near BD20 5AG
Within 2 km, around Riddlesden & East Morton in Bradford. Building, planning, schools, transport, prices and crime.
25new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+6.2%like-for-like prices in Riddlesden & East Morton, 2024 → 2025 (council +5.1%)
-13%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
7homes extended 2021–2025, typically adding 35 m²
50since energy certificates began (2008)
1in BD20 5AG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
16storm overflows within 2 km
1,980hours of spills in 2025 between them (typical neighbourhood: about 36)
360spill events counted
- Yorkshire Water
Keighley (Marley) Stwinto River Aire77 spills, 1,078 hours in 2025
1.6 km away - Yorkshire Water
Keighley (Marley) Stwinto River Aire69 spills, 380 hours in 2025
1.6 km away - Yorkshire Water
Keighley (Marley) Stwinto River Aire37 spills, 174 hours in 2025
1.6 km away - Yorkshire Water
Spring Avenue Csointo River Worth (Via Public Sewer)45 spills, 98 hours in 2025
1.5 km away - Yorkshire Water
Cemetery Lane Csointo River Aire29 spills, 94 hours in 2025
1.6 km away - Yorkshire Water
Bradford Road 5 Csointo Tributary Of The River Aire42 spills, 62 hours in 2025
600 m away - Yorkshire Water
Grange Road 7 Csointo River Aire27 spills, 51 hours in 2025
250 m away - Yorkshire Water
King George Csointo River Aire20 spills, 38 hours in 2025
650 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
20 planned, approved or being built and 2 running (3 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Riverside Business Park, Ings Avenue - Solar PV SystemApproved, not yet built · 160 kW
Jun 2025
750 m away - Battery storage
Dalton LaneApproved, not yet built
Oct 2020
1.0 km away - Rooftop solar
Sainsburys Centre, Cavendish Street - Solar PanelsApproved, not yet built · 720 kW
May 2026
1.6 km away - Rooftop solar
Carlton Keighley, Green Head Road - Solar ArrayApproved, not yet built · 540 kW
Nov 2024
1.8 km away - Rooftop solar
University Academy Keighley, Green Head Road - Solar PanelsApproved, not yet built · 510 kW
Apr 2025
1.8 km away - Rooftop solar
Universal Av Services, Horizon House - Solar PanelsApproved, not yet built · 180 kW
Oct 2022
2.0 km away - Rooftop solar
James Walker Moorflex - Solar PanelsApproved, not yet built
Aug 2022
5.2 km away - Battery storage
Lane Side - Energy StorageApproved, not yet built · 100 MW
Jul 2025
6.9 km away - Rooftop solar
South Craven School, Holme Lane, Cross Hills - Solar panelsApproved, not yet built · 630 kW
Oct 2024
7.1 km away - Rooftop solar
Moorland Engineering Works, Lower Railway Road - Solar PanelsApproved, not yet built · 280 kW
Jun 2025
7.2 km away
Road and street works within 1 km
7 permitted works running now or planned, 3 of them major.
- Major, planned
Granby Drive, KeighleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026
250 m away - Major
Granby Drive, KeighleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
250 m away - Major, planned
Hospital Road, KeighleyUtility repair and maintenance works · BT · Road closure
Nov 2026 to Nov 2026
700 m away - Standard
Bradford Road, KeighleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Oct 2026 to Oct 2026
300 m away - Standard
Banks Lane, KeighleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Nov 2026 to Nov 2026
600 m away - Standard
Aireworth Road, KeighleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Two-way signals
Oct 2026 to Nov 2026
600 m away - Immediate - urgent
Marley Road, KeighleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · No carriageway incursion
Aug 2026 to Oct 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
13.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Bradford West, Harrop Lane, Wilsden - Battery StorageApproved, not yet built · 100 MW
Running nearest: Chelker Reservoir (Retention of Turbines) (wind farm, 9.5 km); Chelker Reservoir (wind farm, 9.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.