Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
21storm overflows within 2 km
798hours of spills in 2025 between them (typical neighbourhood: about 36)
368spill events counted
Yorkshire Water
Dock Lane Csointo Bradford Beck67 spills, 153 hours in 2025
900 m away
Yorkshire Water
Dockfield Road Csointo River Aire51 spills, 133 hours in 2025
850 m away
Yorkshire Water
Buck Mill Lane Csointo Brackendale Beck51 spills, 105 hours in 2025
1.4 km away
Yorkshire Water
Green Lane 125 Csointo River Aire50 spills, 102 hours in 2025
1.6 km away
Yorkshire Water
Midland Road Csointo River Aire24 spills, 88 hours in 2025
700 m away
Yorkshire Water
Coach Road Baildon Csointo River Aire35 spills, 86 hours in 2025
1.6 km away
Yorkshire Water
South Station Road Csointo Barnsley Beack To River Aire39 spills, 50 hours in 2025
1.4 km away
Yorkshire Water
Coach Road Spsinto River Aire5 spills, 49 hours in 2025
45 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Rooftop solar
Marston House, Otley Road - Solar PanelsApproved, not yet built · 3 MW
May 2023 1000 m away
Rooftop solar
Sapper Jordan Rossi Park, Baildon - Solar PanelsApproved, not yet built · 300 kW
Oct 2022 1.5 km away
Rooftop solar
The Waterfront, Salts Mill Road - Solar PanelsApproved, not yet built
May 2024 1.6 km away
Rooftop solar
The Early Music Shop, Salts Mill - Solar PanelsApproved, not yet built · 160 kW
Dec 2024 2.0 km away
Rooftop solar
Baildon CE Primary School, Coverdale Way - Solar Photovoltaic PanelsApproved, not yet built · 170 kW
Dec 2023 2.0 km away
Rooftop solar
Sainsburys - Solar PanelsApproved, not yet built · 310 kW
Sept 2024 3.2 km away
Other
Bradford Low Carbon HydrogenApproved, not yet built
Apr 2024 3.3 km away
Rooftop solar
The University Of Bradford Stadium - Solar PanelsApproved, not yet built · 200 kW
Feb 2024 3.6 km away
Battery storage
Midland Road - Battery Energy StorageApproved, not yet built · 80 MW
Dec 2024 3.7 km away
Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar PanelsApproved, not yet built · 260 kW
Apr 2024 4.4 km away
Road and street works within 1 km
8 permitted works running now or planned.
Standard
Alma Street, ShipleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Give and take
Oct 2026 to Oct 2026 200 m away
Standard
Busy Lane, ShipleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Give and take
Oct 2026 to Oct 2026 250 m away
Standard
Wrosecliffe Grove, ShipleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Jan 2027 to Jan 2027 650 m away
Standard
Wrose Avenue, ShipleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Give and take
Oct 2026 to Oct 2026 950 m away
Standard
Woodcot Avenue, BaildonNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Nov 2026 to Nov 2026 950 m away
Standard
Oakdale Avenue, ShipleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Give and take
Oct 2026 to Oct 2026 950 m away
Minor
Thackley Old Road, ShipleyNew service connection · YORKSHIRE WATER · Two-way signals
Nov 2026 to Nov 2026 250 m away
Minor
Bredon Avenue, ShipleyUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 19.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Windhill: +42% over five years (2020 → 2025).
Council tax list: 40 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.2% in two years.