Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
23storm overflows within 2 km
1,803hours of spills in 2025 between them (typical neighbourhood: about 36)
562spill events counted
Yorkshire Water
Dowley Gap (Bingley) Wwtwinto River Aire58 spills, 471 hours in 2025
1.8 km away
Yorkshire Water
Gilstead Lane 128 Csointo Loadpit Beck73 spills, 218 hours in 2025
1.6 km away
Yorkshire Water
Branksome Drive Csointo River Aire56 spills, 207 hours in 2025
1.8 km away
Yorkshire Water
Primrose Lane Csointo River Aire52 spills, 163 hours in 2025
1.8 km away
Yorkshire Water
Dock Lane Csointo Bradford Beck67 spills, 153 hours in 2025
1.3 km away
Yorkshire Water
Dockfield Road Csointo River Aire51 spills, 133 hours in 2025
1.1 km away
Yorkshire Water
Green Lane 125 Csointo River Aire50 spills, 102 hours in 2025
400 m away
Yorkshire Water
Midland Road Csointo River Aire24 spills, 88 hours in 2025
47 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Rooftop solar
The Early Music Shop, Salts Mill - Solar PanelsApproved, not yet built · 160 kW
Dec 2024 350 m away
Rooftop solar
The Waterfront, Salts Mill Road - Solar PanelsApproved, not yet built
May 2024 500 m away
Rooftop solar
Marston House, Otley Road - Solar PanelsApproved, not yet built · 3 MW
May 2023 2.3 km away
Rooftop solar
Sapper Jordan Rossi Park, Baildon - Solar PanelsApproved, not yet built · 300 kW
Oct 2022 2.6 km away
Rooftop solar
Baildon CE Primary School, Coverdale Way - Solar Photovoltaic PanelsApproved, not yet built · 170 kW
Dec 2023 2.7 km away
Rooftop solar
James Walker Moorflex - Solar PanelsApproved, not yet built
Aug 2022 3.0 km away
Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar PanelsApproved, not yet built · 260 kW
Apr 2024 4.2 km away
Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar panelsApproved, not yet built · 160 kW
Jul 2024 4.2 km away
Rooftop solar
The University Of Bradford Stadium - Solar PanelsApproved, not yet built · 200 kW
Feb 2024 4.5 km away
Battery storage
Midland Road - Battery Energy StorageApproved, not yet built · 80 MW
Dec 2024 4.6 km away
Road and street works within 1 km
8 permitted works running now or planned, 2 of them major.
Major
Dallam Avenue, ShipleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Nov 2026 to Dec 2026 600 m away
Major
Oastler Road, ShipleyHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Nov 2026 800 m away
Standard
William Henry Street, ShipleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · No carriageway incursion
Nov 2026 to Nov 2026 450 m away
Standard
Maddocks Street, ShipleyUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 550 m away
Standard
Ada Street, ShipleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Nov 2026 to Nov 2026 550 m away
Standard
Titus Street, ShipleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · No carriageway incursion
Nov 2026 to Nov 2026 650 m away
Standard
Queens Road, ShipleyUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026 900 m away
Minor
Bingley Road, ShipleyUtility repair and maintenance works · YORKSHIRE WATER · Some carriageway incursion
Oct 2026 to Oct 2026 800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 18.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Baildon South: +32% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.7% in two years.