What's changing near BD17 6DN
Within 2 km, around Baildon South in Bradford. Building, planning, schools, transport, prices and crime.
112new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.4%like-for-like prices in Baildon South, 2024 → 2025 (council +5.1%)
-11%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
27 new homes completedhouses · Oct 2024 – Oct 2026
Oct 2026
1.3 km away - New homes
16 new homes completedhouses · Apr 2025 – Sep 2026
Sept 2026
1.4 km away - New homes
17 new homes completedhouses · Nov 2024 – Aug 2026
Aug 2026
1.2 km away - New homes
12 new homes completedhouses · Feb 2025 – Nov 2025
Nov 2025
1.7 km away - New homes
6 new homes completedhouses · Oct 2024 – Jul 2025
Jul 2025
2.0 km away - New homes
9 new homes completed8 flats, 1 houses · May 2025
May 2025
1.1 km away - New homes
5 new homes completedhouses · Dec 2024 – Apr 2025
Apr 2025
1.3 km away - School closed
School closed: TracksPupil referral unit, pupil referral unit (closure)
Aug 2020
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
4homes extended 2021–2025, typically adding 38 m²
15since energy certificates began (2008)
0in BD17 6DN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
17storm overflows within 2 km
931hours of spills in 2025 between them (typical neighbourhood: about 36)
372spill events counted
- Yorkshire Water
Esholt Lane Csointo River Aire46 spills, 207 hours in 2025
1.3 km away - Yorkshire Water
Dock Lane Csointo Bradford Beck67 spills, 153 hours in 2025
1.7 km away - Yorkshire Water
Dockfield Road Csointo River Aire51 spills, 133 hours in 2025
1.4 km away - Yorkshire Water
Buck Mill Lane Csointo Brackendale Beck51 spills, 105 hours in 2025
750 m away - Yorkshire Water
Green Lane 125 Csointo River Aire50 spills, 102 hours in 2025
1.9 km away - Yorkshire Water
Midland Road Csointo River Aire24 spills, 88 hours in 2025
600 m away - Yorkshire Water
Coach Road Baildon Csointo River Aire35 spills, 86 hours in 2025
1.9 km away - Yorkshire Water
South Station Road Csointo Barnsley Beack To River Aire39 spills, 50 hours in 2025
500 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
45 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Marston House, Otley Road - Solar PanelsApproved, not yet built · 3 MW
May 2023
300 m away - Rooftop solar
Sapper Jordan Rossi Park, Baildon - Solar PanelsApproved, not yet built · 300 kW
Oct 2022
550 m away - Rooftop solar
Baildon CE Primary School, Coverdale Way - Solar Photovoltaic PanelsApproved, not yet built · 170 kW
Dec 2023
900 m away - Rooftop solar
The Waterfront, Salts Mill Road - Solar PanelsApproved, not yet built
May 2024
2.0 km away - Rooftop solar
The Early Music Shop, Salts Mill - Solar PanelsApproved, not yet built · 160 kW
Dec 2024
2.3 km away - Rooftop solar
Sainsburys - Solar PanelsApproved, not yet built · 310 kW
Sept 2024
3.5 km away - Rooftop solar
Guiseley School, Fieldhead Road - Solar PanelsApproved, not yet built · 270 kW
May 2023
3.7 km away - Other
Bradford Low Carbon HydrogenApproved, not yet built
Apr 2024
4.1 km away - Rooftop solar
Guiseley Primary School, Oxford Road - Solar PanelsApproved, not yet built · 200 kW
Jul 2024
4.4 km away - Rooftop solar
The University Of Bradford Stadium - Solar PanelsApproved, not yet built · 200 kW
Feb 2024
4.7 km away
Road and street works within 1 km
9 permitted works running now or planned, 1 of them major.
- Major
Silson Lane, BaildonHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Nov 2026
600 m away - Standard
Pasture Road, BaildonNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Nov 2026 to Nov 2026
400 m away - Standard
Strathallan Drive, BaildonDisconnection or alteration of supply · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Oct 2026 to Oct 2026
500 m away - Standard
Woodcot Avenue, BaildonNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Nov 2026 to Nov 2026
500 m away - Standard
Glenholm Road, BaildonNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Dec 2026 to Dec 2026
900 m away - Standard
Busy Lane, ShipleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Give and take
Oct 2026 to Oct 2026
900 m away - Minor
Thackley Old Road, ShipleyNew service connection · YORKSHIRE WATER · Two-way signals
Nov 2026 to Nov 2026
900 m away - Minor
Brackendale Drive, BradfordNew service connection · BT · Some carriageway incursion
Oct 2026 to Oct 2026
900 m away - Minor
Windhill Old Road, BradfordNew service connection · BT · No carriageway incursion
Oct 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
20.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 2.9 km); Esholt WWTW (other, 2.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.