Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
19storm overflows within 2 km
801hours of spills in 2025 between them (typical neighbourhood: about 36)
359spill events counted
Yorkshire Water
Dock Lane Csointo Bradford Beck67 spills, 153 hours in 2025
500 m away
Yorkshire Water
Dockfield Road Csointo River Aire51 spills, 133 hours in 2025
200 m away
Yorkshire Water
Buck Mill Lane Csointo Brackendale Beck51 spills, 105 hours in 2025
2.0 km away
Yorkshire Water
Green Lane 125 Csointo River Aire50 spills, 102 hours in 2025
600 m away
Yorkshire Water
Midland Road Csointo River Aire24 spills, 88 hours in 2025
750 m away
Yorkshire Water
Coach Road Baildon Csointo River Aire35 spills, 86 hours in 2025
650 m away
Yorkshire Water
South Station Road Csointo Barnsley Beack To River Aire39 spills, 50 hours in 2025
1.2 km away
Yorkshire Water
Coach Road Spsinto River Aire5 spills, 49 hours in 2025
48 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Rooftop solar
The Waterfront, Salts Mill Road - Solar PanelsApproved, not yet built
May 2024 700 m away
Rooftop solar
The Early Music Shop, Salts Mill - Solar PanelsApproved, not yet built · 160 kW
Dec 2024 1.0 km away
Rooftop solar
Marston House, Otley Road - Solar PanelsApproved, not yet built · 3 MW
May 2023 1.5 km away
Rooftop solar
Sapper Jordan Rossi Park, Baildon - Solar PanelsApproved, not yet built · 300 kW
Oct 2022 1.9 km away
Rooftop solar
Baildon CE Primary School, Coverdale Way - Solar Photovoltaic PanelsApproved, not yet built · 170 kW
Dec 2023 2.2 km away
Rooftop solar
James Walker Moorflex - Solar PanelsApproved, not yet built
Aug 2022 3.9 km away
Rooftop solar
The University Of Bradford Stadium - Solar PanelsApproved, not yet built · 200 kW
Feb 2024 4.0 km away
Battery storage
Midland Road - Battery Energy StorageApproved, not yet built · 80 MW
Dec 2024 4.1 km away
Rooftop solar
Sainsburys - Solar PanelsApproved, not yet built · 310 kW
Sept 2024 4.1 km away
Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar PanelsApproved, not yet built · 260 kW
Apr 2024 4.2 km away
Road and street works within 1 km
14 permitted works running now or planned, 7 of them major.
Major
Kirkgate, ShipleyHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Sept 2026 to Dec 2026 650 m away
Major
Market Square, ShipleyHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Sept 2026 to Dec 2026 700 m away
Major
Market Street, ShipleyHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Sept 2026 to Dec 2026 750 m away
Major
Central Avenue, ShipleyHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Some carriageway incursion
Sept 2026 to Dec 2026 750 m away
Major
Well Croft, ShipleyHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · No carriageway incursion
Sept 2026 to Dec 2026 750 m away
Major, planned
Cross Banks, ShipleyHighway repair and maintenance works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Give and take
Oct 2026 to Oct 2026 950 m away
Major
Prospect Avenue, ShipleyHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Nov 2026 1000 m away
Standard
Otley Road, ShipleyHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026 600 m away
Standard
Back Market Square West, ShipleyNew service connection · NORTHERN GAS NETWORKS · Some carriageway incursion
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 18.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Baildon South: +32% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.7% in two years.