Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
1,263hours of spills in 2025 between them (typical neighbourhood: about 36)
341spill events counted
Yorkshire Water
Dowley Gap (Bingley) Wwtwinto River Aire58 spills, 471 hours in 2025
1.2 km away
Yorkshire Water
Gilstead Lane 128 Csointo Loadpit Beck73 spills, 218 hours in 2025
400 m away
Yorkshire Water
Branksome Drive Csointo River Aire56 spills, 207 hours in 2025
1.5 km away
Yorkshire Water
Primrose Lane Csointo River Aire52 spills, 163 hours in 2025
1.2 km away
Yorkshire Water
Beckfoot Lane Csointo River Aire23 spills, 73 hours in 2025
1.8 km away
Yorkshire Water
Old Main Street Csointo Various3 spills, 46 hours in 2025
1.9 km away
Yorkshire Water
Dowley Gap (Bingley) Wwtwinto River Aire20 spills, 40 hours in 2025
1.2 km away
Yorkshire Water
Gilstead Lane 130 2 Csointo Little Beck Clvrtd Via Sws8 spills, 16 hours in 2025
39 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Rooftop solar
James Walker Moorflex - Solar PanelsApproved, not yet built
Aug 2022 1.4 km away
Rooftop solar
The Early Music Shop, Salts Mill - Solar PanelsApproved, not yet built · 160 kW
Dec 2024 2.1 km away
Rooftop solar
The Waterfront, Salts Mill Road - Solar PanelsApproved, not yet built
May 2024 2.4 km away
Rooftop solar
Baildon CE Primary School, Coverdale Way - Solar Photovoltaic PanelsApproved, not yet built · 170 kW
Dec 2023 4.0 km away
Rooftop solar
Marston House, Otley Road - Solar PanelsApproved, not yet built · 3 MW
May 2023 4.0 km away
Rooftop solar
Sapper Jordan Rossi Park, Baildon - Solar PanelsApproved, not yet built · 300 kW
Oct 2022 4.2 km away
Battery storage
Lane Side - Energy StorageApproved, not yet built · 100 MW
Jul 2025 5.0 km away
Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar PanelsApproved, not yet built · 260 kW
Apr 2024 5.3 km away
Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar panelsApproved, not yet built · 160 kW
Jul 2024 5.3 km away
Battery storage
Dalton LaneApproved, not yet built
Oct 2020 5.4 km away
Battery storage
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 16.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Saltaire & Baildon West: +28% over five years (2020 → 2025).
Council tax list: 100 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.5% in two years.