Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
696hours of spills in 2025 between them (typical neighbourhood: about 36)
161spill events counted
Yorkshire Water
Morton Csointo River Aire94 spills, 379 hours in 2025
1.6 km away
Yorkshire Water
Bradford Roadinto River Aire51 spills, 235 hours in 2025
1.4 km away
Yorkshire Water
Old Main Street Csointo Various3 spills, 46 hours in 2025
900 m away
Yorkshire Water
Crossflatts No 2 Spsinto River Aire11 spills, 36 hours in 2025
600 m away
Yorkshire Water
Waverley Avenue Csointo River Aire2 spills, 1 hours in 2025
32 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Rooftop solar
James Walker Moorflex - Solar PanelsApproved, not yet built
Aug 2022 1.6 km away
Battery storage
Dalton LaneApproved, not yet built
Oct 2020 3.3 km away
Rooftop solar
The Early Music Shop, Salts Mill - Solar PanelsApproved, not yet built · 160 kW
Dec 2024 4.1 km away
Rooftop solar
Riverside Business Park, Ings Avenue - Solar PV SystemApproved, not yet built · 160 kW
Jun 2025 4.3 km away
Rooftop solar
Universal Av Services, Horizon House - Solar PanelsApproved, not yet built · 180 kW
Oct 2022 4.3 km away
Rooftop solar
Sainsburys Centre, Cavendish Street - Solar PanelsApproved, not yet built · 720 kW
May 2026 4.3 km away
Rooftop solar
The Waterfront, Salts Mill Road - Solar PanelsApproved, not yet built
May 2024 4.5 km away
Battery storage
Lane Side - Energy StorageApproved, not yet built · 100 MW
Jul 2025 4.8 km away
Rooftop solar
Carlton Keighley, Green Head Road - Solar ArrayApproved, not yet built · 540 kW
Nov 2024 5.3 km away
Rooftop solar
University Academy Keighley, Green Head Road - Solar PanelsApproved, not yet built · 510 kW
Apr 2025 5.3 km away
Battery storage
Road and street works within 1 km
3 permitted works running now or planned.
Standard
Keighley Road, BingleyUtility repair and maintenance works · YORKSHIRE WATER · Multi-way signals
Oct 2026 to Oct 2026 400 m away
Standard
Langley Road, BingleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Nov 2026 to Nov 2026 1000 m away
Minor
Villa Road, BingleyUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 15.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Crossflatts & Eldwick: +25% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.5% in two years.