Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
12storm overflows within 2 km
1,259hours of spills in 2025 between them (typical neighbourhood: about 36)
340spill events counted
Yorkshire Water
Dowley Gap (Bingley) Wwtwinto River Aire58 spills, 471 hours in 2025
900 m away
Yorkshire Water
Gilstead Lane 128 Csointo Loadpit Beck73 spills, 218 hours in 2025
1.7 km away
Yorkshire Water
Branksome Drive Csointo River Aire56 spills, 207 hours in 2025
1.0 km away
Yorkshire Water
Primrose Lane Csointo River Aire52 spills, 163 hours in 2025
900 m away
Yorkshire Water
Beckfoot Lane Csointo River Aire23 spills, 73 hours in 2025
400 m away
Yorkshire Water
Old Main Street Csointo Various3 spills, 46 hours in 2025
1.4 km away
Yorkshire Water
Dowley Gap (Bingley) Wwtwinto River Aire20 spills, 40 hours in 2025
900 m away
Yorkshire Water
Gilstead Lane 130 2 Csointo Little Beck Clvrtd Via Sws8 spills, 16 hours in 2025
43 planned, approved or being built and 3 running (22 MW between them). Those within 5 km are on the map above.
Rooftop solar
James Walker Moorflex - Solar PanelsApproved, not yet built
Aug 2022 450 m away
Rooftop solar
The Early Music Shop, Salts Mill - Solar PanelsApproved, not yet built · 160 kW
Dec 2024 2.6 km away
Rooftop solar
The Waterfront, Salts Mill Road - Solar PanelsApproved, not yet built
May 2024 3.0 km away
Battery storage
Lane Side - Energy StorageApproved, not yet built · 100 MW
Jul 2025 3.5 km away
Battery storage
Bradford West, Harrop Lane, Wilsden - Battery StorageApproved, not yet built · 100 MW
May 2023 4.0 km away
Battery storage
Bradford West Substation (Harrop Edge Farm)Being built · 50 MW
Jul 2022 4.1 km away
Battery storage
Peat Dykes Farm, Harrop Lane - Battery Energy Storage SystemApproved, not yet built · 100 MW
Jun 2026 4.5 km away
Battery storage
Old Allen Road, Wilsden - Battery Energy Storage SystemPlanning application in · 100 MW
Oct 2025 4.6 km away
Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar PanelsApproved, not yet built · 260 kW
Apr 2024 4.6 km away
Rooftop solar
Bradford Girls Grammar School, Squire Lane - Solar panelsApproved, not yet built · 160 kW
Jul 2024 4.6 km away
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
Major
Crosley Wood Road, BingleyHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Nov 2026 450 m away
Major
Leonard Street, BingleyHighway improvement works · CITY OF BRADFORD METROPOLITAN DISTRICT COUNCIL · Road closure
Oct 2026 to Nov 2026 600 m away
Standard
Bradford Road, BingleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Lane closure
Nov 2026 to Nov 2026 900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 15.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Cottingley, Harden & Wilsden: +29% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.0% in two years.